Regulation 2(7)
Regulation 4(1)
1.—(1) For the purposes of this Schedule, any structures and devices on top of a well shall be treated as forming part of the well.
(2) Any reference in this Schedule to premises and activities includes a reference to any person, article or substance on those premises or engaged in, or, as the case may be, used or for use in connection with any such activity, but does not include a reference to an aircraft which is airborne.
2. This paragraph shall apply to and in relation to—
(a) any offshore installation and any activity on it;
(b) any activity in connection with an offshore installation, or any activity which is immediately preparatory thereto, whether carried on from the installation itself, on or from a vessel or in any other manner, other than—
(i) transporting, towing or navigating the installation; and
(ii) any activity in or from a vessel being used as a stand-by vessel;
(c) a diving project involving—
(i) the survey and preparation of the sea bed for an offshore installation;
(ii) the survey and restoration of the sea bed consequent on the removal of an offshore installation.
3.—(1) Subject to sub-paragraph (2), this paragraph applies to and in relation to—
(a) a well and any activity in connection with it; and
(b) an activity which is immediately preparatory to any activity in head (a).
(2) Sub-paragraph (1) includes keeping a vessel on station for the purpose of working on a well but otherwise does not include navigation or an activity connected with navigation.
4. This paragraph applies to and in relation to—
(a) any pipeline;
(b) any pipeline works;
(c) the following activities in connection with pipeline works—
(i) the loading, unloading, fuelling or provisioning of a vessel;
(ii) the loading, unloading, fuelling, repair and maintenance of an aircraft on a vessel,
being in either case a vessel which is engaged in pipeline works.”
Regulation 3(6)
Regulation 3(1)
1.—(1) For the purposes of this Schedule, any structures and devices on top of a well shall be treated as forming part of the well.
(2) Any reference in this Schedule to premises and activities includes a reference to any person, article or substance on those premises or engaged in, or, as the case may be, used or for use in connection with any such activity, but does not include a reference to an aircraft which is airborne.
2. This paragraph shall apply to and in relation to—
(a) any installation and any activity on it;
(b) any activity in connection with an installation, or any activity which is immediately preparatory thereto, whether carried on from the installation itself, on or from a vessel or in any other manner, other than—
(i) transporting, towing or navigating the installation; and
(ii) any activity in or from a vessel being used as a stand-by vessel;
(c) a diving project involving—
(i) the survey and preparation of the sea bed for an installation;
(ii) the survey and restoration of the sea bed consequent on the removal of an installation.
3.—(1) Subject to sub-paragraph (2), this paragraph applies to and in relation to—
(a) a well and any activity in connection with it; and
(b) an activity which is immediately preparatory to any activity in head (a).
(2) Sub-paragraph (1) includes keeping a vessel on station for the purpose of working on a well but otherwise does not include navigation or an activity connected with navigation.
4. This paragraph applies to and in relation to—
(a) any pipeline;
(b) any pipeline works;
(c) the following activities in connection with pipeline works—
(i) the loading, unloading, fuelling or provisioning of a vessel;
(ii) the loading, unloading, fuelling, repair and maintenance of an aircraft on a vessel,
being in either case a vessel which is engaged in pipeline works.”