Search Legislation

The Environmental Permitting (England and Wales) Regulations 2007

Status:

This is the original version (as it was originally made).

  1. Introductory Text

  2. PART 1 General

    1. 1.Citation, commencement and extent

    2. 2.Interpretation: general

    3. 3.Interpretation: activities, installations and mobile plant

    4. 4.Interpretation: excluded waste operation

    5. 5.Interpretation: exempt waste operation

    6. 6.Interpretation: local authority

    7. 7.Interpretation: operator

    8. 8.Interpretation: regulated facility

    9. 9.Interpretation: relevant function

    10. 10.Giving notices, notifications and directions, and the submission of forms

  3. PART 2 Environmental Permits

    1. CHAPTER 1 Application of these Regulations to the Crown and requirement for an environmental permit

      1. 11.Application of these Regulations to the Crown

      2. 12.Requirement for an environmental permit

    2. CHAPTER 2 Grant of an environmental permit

      1. 13.Grant of an environmental permit

      2. 14.Content and form of an environmental permit

      3. 15.Conditions in relation to certain land

      4. 16.Mobile plant operating on the site of another regulated facility: conflict of permit conditions

      5. 17.Single site permits etc.

      6. 18.Consolidation of an environmental permit

      7. 19.Subsistence of an environmental permit

    3. CHAPTER 3 Variation, transfer, revocation and surrender of an environmental permit

      1. 20.Variation of an environmental permit

      2. 21.Transfer of an environmental permit

      3. 22.Revocation of an environmental permit: general

      4. 23.Revocation of an environmental permit: steps to be taken after the revocation takes effect

      5. 24.Notification of the surrender of an environmental permit

      6. 25.Application to surrender an environmental permit

    4. CHAPTER 4 Standard rules

      1. 26.Preparation and revision of standard rules

      2. 27.Standard rules as conditions of an environmental permit

      3. 28.Notification of revisions of standard rules

      4. 29.Revocation of standard rules

      5. 30.Variation of an environmental permit: revocation of standard rules

    5. CHAPTER 5 Appeals in relation to environmental permits

      1. 31.Appeals to an appropriate authority

  4. PART 3 Discharge of functions in relation to a regulated facility

    1. 32.Discharge of functions

    2. 33.Direction to a regulator: discharge of functions by a different regulator

    3. 34.Review of environmental permits and inspection of regulated facilities

    4. 35.Provision in relation to types of regulated facility

  5. PART 4 Enforcement and offences

    1. 36.Enforcement notices

    2. 37.Suspension notices

    3. 38.Offences

    4. 39.Penalties

    5. 40.Defence: acts done in an emergency

    6. 41.Offences by bodies corporate

    7. 42.Enforcement by the High Court

    8. 43.Admissibility of evidence

    9. 44.Power of court to order cause of offence to be remedied

  6. PART 5 Public Registers

    1. 45.Interpretation of this Part

    2. 46.Duty of the regulator to maintain a public register

    3. 47.Exclusion from public registers of information affecting national security

    4. 48.Exclusion from public registers of confidential information

    5. 49.Procedure if the regulator considers that information may be confidential

    6. 50.Duty to determine confidentiality

    7. 51.Determination of confidentiality

    8. 52.Procedure following a determination

    9. 53.Appeals in relation to confidentiality

    10. 54.Consequences of an appeal

    11. 55.Reconsideration of confidentiality

    12. 56.Directions of the appropriate authority in relation to confidentiality

  7. PART 6 Powers and functions of the regulator and the appropriate authority

    1. 57.Power of the regulator to prevent or remedy pollution

    2. 58.Environment Agency: notices in relation to emissions to water

    3. 59.Environment Agency: public participation statement

    4. 60.Power to require the provision of information

    5. 61.Directions to a regulator: general

    6. 62.Reference of applications to an appropriate authority

    7. 63.Directions to the Agency: installations outside the United Kingdom

    8. 64.Guidance to regulators and exemption registration authorities

    9. 65.Fees and charges in relation to local authorities

    10. 66.Plans relating to emissions

  8. PART 7 Miscellaneous and transitional provision, savings, consequential amendments, revocations and repeals

    1. 67.Interpretation of this Part

    2. 68.Further provision in relation to waste

    3. 69.Transitional provision: general

    4. 70.Transitional provision: conversion of permits and licences subject to certain applications

    5. 71.Transitional provision: conversion of PPC permits resulting from applications in relation to existing Part A installations and mobile plant

    6. 72.Savings

    7. 73.Consequential amendments

    8. 74.Revocations and repeals

  9. Signature

    1. SCHEDULE 1

      Activities

      1. PART 1 Interpretation and application: general

        1. 1.Interpretation

        2. 2.Activities falling within more than one Part description

        3. 3.Application of activities falling within Sections 1.1 to 6.9 of Part 2

        4. 4.Capacity: Part A(1) and A(2) descriptions

        5. 5.Operation below thresholds: effect on the installation

        6. 6.Application of Part B activities: releases into the air

        7. 7.References to releases into water

        8. 8.References to certain substances

      2. PART 2 Activities

        1. CHAPTER 1 Energy activities

          1. SECTION 1.1 Combustion activities

            1. Interpretation of Section 1.1

              1. 1.In this Section “recovered oil” means waste oil which has...

              2. Part A(1)

            2. Interpretation and application of Part A(1)

              1. 1.For the purpose of paragraph (a), where two or more...

              2. 2.Nothing in this Part of this Section applies to burning...

              3. 3.In paragraph 2, “offshore platform” means any fixed or floating...

              4. 4.In paragraph 3, “petroleum” includes any mineral oil or relative...

              5. 5.In paragraph (b)(iii), “fuel” does not include gas produced by...

              6. Part B

            3. Interpretation and application of Part B

              1. 1.This Part does not apply to any activity falling within...

              2. 2.In this Part, “net rated thermal input” is the rate...

              3. 3.In paragraph (c), “fuel” does not include gas produced by...

          2. SECTION 1.2 Gasification, Liquefaction and Refining Activities

            1. Part A(1)

            2. Interpretation and application of Part A(1)

              1. 1.Paragraph (j) does not include— (a) the use of any...

              2. 2.In paragraph (j), the heat treatment of oil, other than...

              3. 3.In this Part, “carbonaceous material” includes such materials as charcoal,...

              4. Part A(2)

              5. Part B

            3. Interpretation of Part B

              1. 1.In this Part— “existing service station” means a service station—...

              2. 2.Any other expressions used in this Part which are also...

        2. CHAPTER 2 Production and Processing of Metals

          1. SECTION 2.1 Ferrous Metals

            1. Interpretation of Section 2.1

              1. 1.In this Section, “ferrous alloy” means an alloy of which...

              2. Part A(1)

              3. Part A(2)

              4. Part B

          2. SECTION 2.2 Non-Ferrous Metals

            1. Interpretation and application of Section 2.2

              1. 1.In this Section “non-ferrous metal alloy” means an alloy which...

              2. 2.Part A(1)(c) to (h) and Part B do not apply...

              3. Part A(1)

            2. Interpretation of Part A(1)

              1. 1.In paragraph (g), “background concentration” means any concentration of cadmium...

              2. Part A(2)

              3. Part B

            3. Interpretation and application of Part B

              1. 1.In this Part “net rated thermal input” is the rate...

              2. 2.When determining the extent of an installation carrying on an...

          3. SECTION 2.3 Surface Treating Metals and Plastic Materials

            1. Part A(1)

            2. Part A(2)

            3. Part B

        3. CHAPTER 3 Mineral Industries

          1. SECTION 3.1 Production of Cement and Lime

            1. Part A(1)

            2. Part A(2)

            3. Part B

          2. SECTION 3.2 Activities Involving Asbestos

            1. Interpretation of Section 3.2

              1. 1.In this Section “asbestos” means any of the following fibrous...

              2. Part A(1)

              3. Part B

          3. SECTION 3.3 Manufacturing Glass and Glass Fibre

            1. Part A(1)

            2. Part A(2)

            3. Part B

          4. SECTION 3.4 Production of Other Mineral Fibres

            1. Part A(1)

          5. SECTION 3.5 Other Mineral Activities

            1. Part A(2)

            2. Part B

            3. 1.Interpretation and application of Part B

            4. 2.This Part does not apply to any activity carried on...

          6. SECTION 3.6 Ceramic Production

            1. Part A(1)

            2. Part A(2)

            3. Part B

            4. Interpretation of Part B

              1. 1.In this Part— “clay” includes a blend of clay with...

        4. CHAPTER 4

          1. The Chemical Industry

            1. Interpretation of Chapter 4

              1. 1.In Part A(1) of the Sections of this Chapter, “producing”...

          2. SECTION 4.1 Organic Chemicals

            1. Interpretation of Section 4.1

              1. 1.In this Section, “pre-formulated resin or pre-formulated gel coat” means...

              2. Part A(1)

              3. Part B

          3. SECTION 4.2 Inorganic Chemicals

            1. Part A(1)

          4. SECTION 4.3 Chemical Fertiliser Production

            1. Part A(1)

          5. SECTION 4.4 Plant Health Products and Biocides

            1. Part A(1)

          6. SECTION 4.5 Pharmaceutical Production

            1. Part A(1)

          7. SECTION 4.6 Explosives Production

            1. Part A(1)

          8. SECTION 4.7 Manufacturing Activities Involving Carbon Disulphide or Ammonia

            1. Part A(1)

          9. SECTION 4.8 The Storage of Chemicals in Bulk

            1. Part B

        5. CHAPTER 5 Waste Management

          1. SECTION 5.1 Incineration and Co-incineration of Waste

            1. Interpretation of Section 5.1

              1. 1.In this Section— “co-incineration” means the use of wastes as...

              2. Part A(1)

              3. Part A(2)

              4. Part B

            2. Application of Part B

              1. 1.When determining the extent of an installation carrying on an...

          2. SECTION 5.2 Disposal of Waste by Landfill

            1. Part A(1)

          3. SECTION 5.3 Disposal of Waste Other Than by Incineration or Landfill

            1. Part A(1)

            2. Interpretation and application of Part A(1)

              1. 1.In paragraph (b) “disposal” means the processing or destruction of...

              2. 2.This Part does not apply to the treatment of—

              3. 3.The reference to a D paragraph number in brackets at...

          4. SECTION 5.4 Recovery of Waste

            1. Part A(1)

            2. Interpretation and application of Part A(1)

              1. 1.Paragraphs (a) and (b) of this Part do not apply...

              2. 2.This Part does not apply to the treatment of—

              3. 3.The reference to an R paragraph number in brackets at...

          5. SECTION 5.5 The Production of Fuel from Waste

            1. Part A(1)

        6. CHAPTER 6 Other Activities

          1. SECTION 6.1 Paper, Pulp and Board Manufacturing Activities

            1. Part A(1)

            2. Interpretation of Part A(1)

              1. 1.In paragraph (c), “paper pulp” includes pulp made from wood,...

              2. Part A(2)

          2. SECTION 6.2 Carbon Activities

            1. Part A(1)

          3. SECTION 6.3 Tar and Bitumen Activities

            1. Part A(1)

            2. Part B

            3. Interpretation of Part B

              1. 1.In this Part “tar” and “bitumen” include pitch.

          4. SECTION 6.4 Coating Activities, Printing and Textile Treatments

            1. Part A(1)

            2. Part A(2)

            3. Part B

            4. Interpretation and application of Part B

              1. 1.In this Part— “aircraft” includes gliders and missiles; “coating material”...

              2. 2.The amount of organic solvents used in an activity must...

              3. 3.When determining the extent of an installation carrying on an...

          5. SECTION 6.5 The Manufacture of Dyestuffs, Printing Ink and Coating Materials

            1. Part B

            2. Interpretation of Part B

              1. 1.In this Part, “coating material” has the same meaning as...

              2. 2.The amount of organic solvents used in an activity must...

          6. SECTION 6.6 Timber Activities

            1. Part A(1)

            2. Part B

            3. Interpretation of Part B

              1. 1.In this Part— “excluded activity” means any relevant activity (other...

          7. SECTION 6.7 Activities Involving Rubber

            1. Part A(2)

            2. Part B

          8. SECTION 6.8 The Treatment of Animal and Vegetable Matter and Food Industries

            1. Interpretation of Section 6.8

              1. 1.In this Section— “animal” includes a bird or a fish;...

              2. Part A(1)

              3. Part A(2)

              4. Part B

          9. SECTION 6.9 Intensive Farming

            1. Part A(1)

          10. SECTION 7 SED Activities

            1. Part B

            2. Interpretation and application of Part B

              1. 1.For the purposes of this Part— “adhesive” means any preparation,...

              2. 2.An activity must be deemed to be operated above the...

              3. 3.An activity listed in this Part includes the cleaning of...

    2. SCHEDULE 2

      Exempt waste operations: general

      1. 1.Interpretation: general

      2. 2.Interpretation: exemption registration authority

      3. 3.Registration, notification and consent requirements for exempt waste operations

      4. 4.Registration of exempt waste operations

      5. 5.Duty to remove entries from the register

      6. 6.Extra requirements in relation to recovery and storage of scrap metal or waste motor vehicles

      7. 7.Removal of entries in relation to recovery and storage of scrap metal or waste motor vehicles

      8. 8.Notifiable exempt waste operations: giving notice

      9. 9.Notifiable exempt waste operations: changes to the quantity of waste disposed of or recovered

      10. 10.Notifiable exempt waste operations: renewal notices

      11. 11.Notifiable exempt waste operations: duties of the exemption registration authority

      12. 12.Record keeping

      13. 13.Periodic inspections

    3. SCHEDULE 3

      Descriptions: exempt waste operations and other operations to which section 33(1)(a) of the 1990 Act does not apply

      1. PART 1 Exempt waste operations: descriptions

        1. 1.Interpretation

        2. 2.Scrap metal furnaces

        3. 3.Burning waste as a fuel

        4. 4.Packaging or containers

        5. 5.Burning waste as a fuel in small appliances

        6. 6.Sludge on land

        7. 7.Waste for the benefit of land

        8. 8.Storage of sludge which is to be used in accordance with the 1989 Regulations

        9. 9.Land reclamation or improvement

        10. 10.Sewage and water treatment works

        11. 11.Preparatory treatments of certain waste

        12. 12.Composting waste

        13. 13.Construction and soil materials

        14. 14.Manufacturing finished goods

        15. 15.Use of waste

        16. 16.Biobeds

        17. 17.Storage of waste in a secure place

        18. 18.Waste in secure containers

        19. 19.Waste for construction

        20. 20.Recovery of textiles

        21. 21.Preparatory treatments of waste plant matter

        22. 22.Recovery of silver

        23. 23.Recovery of waste consisting of animal by-products at a collection centre

        24. 24.Crushing, grinding or size reduction of bricks, tiles or concrete

        25. 25.Waterway dredging

        26. 26.Recovery or disposal as part of the production process

        27. 27.Baling, compacting, crushing, shredding or pulverising

        28. 28.Spreading ash

        29. 29.Disposal by burning at the place of production

        30. 30.Burning waste in the open

        31. 31.Waste from railway sanitary conveniences or sinks

        32. 32.Waste from sanitary conveniences with removable receptacles

        33. 33.Peatworking

        34. 34.Railway ballast

        35. 35.Waste from prospecting

        36. 36.Spreading dredgings

        37. 37.The deposit of agricultural waste consisting of plant tissue at the place of production

        38. 38.Samples of waste

        39. 39.Storage of medicines and medical, nursing or veterinary waste

        40. 40.Repair or refurbishment of WEEE

        41. 41.Secure storage of WEEE

        42. 42.Crushing waste discharge lamps

        43. 43.Glass Manufacture and Production

        44. 44.Heating metals and metal alloys for the purpose of removing grease, oil or any other non-metallic contaminant

        45. 45.Recovery of scrap metal or the dismantling of waste motor vehicles

        46. 46.Burning plant tissue waste and wood at a dock

        47. 47.Treating land by the spreading of agricultural waste

        48. 48.Pet burial

      2. PART 2 Other operations to which section 33(1)(a) of the 1990 Act does not apply: descriptions

        1. 49.Temporary storage of ships' garbage or tank washings

        2. 50.Storing non-liquid waste pending its management elsewhere

        3. 51.Temporary storage of scrap rails

        4. 52.Temporary storage of waste on the site where it is produced

    4. SCHEDULE 4

      Application of these Regulations to the Crown

      1. 1.Crown application

      2. 2.Contravention of these Regulations by the Crown

      3. 3.Entry to Crown premises

      4. 4.Service on certain Crown operators

    5. SCHEDULE 5

      Environmental permits

      1. PART 1 Grant, variation, transfer and surrender of environmental permits

        1. 1.Interpretation

        2. 2.Making an application

        3. 3.Withdrawing an application

        4. 4.Further information in respect of a duly-made application

        5. 5.Public participation: scope

        6. 6.Public participation in relation to certain applications

        7. 7.Calculation of the consultation communication period

        8. 8.Public participation in relation to regulator initiated variations

        9. 9.Consultation: conditions mentioned in regulation 15(1)

        10. 10.Consultation with other member States

        11. 11.Duty to consider representations

        12. 12.Duty to determine an application

        13. 13.Identity and competence of the operator

        14. 14.Surrender applications

        15. 15.Time limits for determination

        16. 16.Calculation of the relevant period

        17. 17.Notification of a determination or decision

        18. 18.Date of effect of certain determinations and decisions

        19. 19.Form of certain determinations and decisions: consolidation of permits

      2. PART 2 Compensation in relation to conditions affecting certain interests in land

        1. 20.Interpretation

        2. 21.Entitlement to compensation

        3. 22.Loss and damage for which compensation is payable

        4. 23.Date when entitlement to compensation arises

        5. 24.Application for compensation

        6. 25.Assessment of the amount to be paid by way of compensation

        7. 26.Payment of compensation

        8. 27.Interest payable on compensation

    6. SCHEDULE 6

      Appeals to the appropriate authority

      1. 1.Interpretation

      2. 2.Making an appeal

      3. 3.Time limit for making an appeal

      4. 4.Notice to affected and interested persons

      5. 5.Hearing before an appointed person

      6. 6.Notice of determination of an appeal

      7. 7.Procedure following the quashing of a determination of an appropriate authority

    7. SCHEDULE 7

      Provision in relation to Part A installations and Part A mobile plant

      1. 1.Application

      2. 2.Interpretation

      3. 3.Exercise of regulator’s functions: general

      4. 4.Applications for an environmental permit

      5. 5.Exercise of relevant functions

      6. 6.Public participation

      7. 7.Review of environmental permits

      8. 8.Developments in best available techniques

    8. SCHEDULE 8

      Provision in relation to Part B installations and Part B mobile plant

      1. 1.Application

      2. 2.Interpretation

      3. 3.Exercise of regulator’s functions: general

      4. 4.Applications for an environmental permit

      5. 5.Exercise of relevant functions

      6. 6.Review of environmental permits

      7. 7.Developments in best available techniques

    9. SCHEDULE 9

      Provision in relation to waste operations

      1. 1.Application

      2. 2.Grant of an environmental permit: requirement for prior planning permission

      3. 3.Exercise of relevant functions: all waste operations

      4. 4.Exercise of relevant functions: disposal of waste

    10. SCHEDULE 10

      Provision in relation to landfill

      1. 1.Application

      2. 2.Interpretation: general

      3. 3.Applications for an environmental permit

      4. 4.Inspection prior to operation

      5. 5.Exercise of relevant functions

      6. 6.Interpretation of the Landfill Directive for the exercise of relevant functions

      7. 7.Interpretation of the Decision Annex for the exercise of relevant functions: general

      8. 8.Interpretation of the Decision Annex for the exercise of relevant functions: additional acceptance criteria relating to physical stability and bearing capacity of granular waste

      9. 9.Interpretation of the Decision Annex for the exercise of relevant functions: additional acceptance criteria in relating to monolithic waste

      10. 10.Closure of a landfill

      11. 11.Surrender applications

    11. SCHEDULE 11

      Provision in relation to waste motor vehicles

      1. 1.Application

      2. 2.Interpretation

      3. 3.Exercise of relevant functions

    12. SCHEDULE 12

      Provision in relation to waste electrical and electronic equipment

      1. 1.Application

      2. 2.Interpretation

      3. 3.Exercise of relevant functions

    13. SCHEDULE 13

      Provision in relation to waste incineration

      1. 1.Application

      2. 2.Interpretation

      3. 3.Applications for an environmental permit

      4. 4.Exercise of relevant functions

    14. SCHEDULE 14

      Provision in relation to SED installations

      1. 1.Application

      2. 2.Interpretation

      3. 3.Exercise of relevant functions

    15. SCHEDULE 15

      Provision in relation to certain combustion plants

      1. 1.Application

      2. 2.Interpretation

      3. 3.Exercise of relevant functions

    16. SCHEDULE 16

      Provision in relation to asbestos

      1. 1.Application

      2. 2.Interpretation

      3. 3.Exercise of relevant functions

    17. SCHEDULE 17

      Provision in relation to titanium dioxide

      1. 1.Application

      2. 2.Interpretation

      3. 3.Exercise of relevant functions

    18. SCHEDULE 18

      Provision in relation to petrol vapour recovery

      1. 1.Application

      2. 2.Interpretation

      3. 3.Exercise of relevant functions

    19. SCHEDULE 19

      Public registers

      1. 1.Matters to be included in a public register

      2. 2.Information no longer relevant for public participation

      3. 3.Formal cautions

    20. SCHEDULE 20

      Further provision relating to waste

      1. 1.Interpretation: general

      2. 2.Interpretation: specified functions

      3. 3.Exercise of specified functions: all waste operations

      4. 4.Exercise of specified functions: disposal of waste

      5. 5.Periodic inspections

      6. 6.Requirements applying to planning authorities

    21. SCHEDULE 21

      Consequential amendments

      1. PART 1 Public General Acts

        1. 1.Public Health Act 1961

        2. 2.Environmental Protection Act 1990

        3. 3.(1) Section 29 is amended as follows.

        4. 4.(1) Section 33 is amended as follows.

        5. 5.For section 33A(1), substitute— (1) This section applies where a...

        6. 6.For section 33B(1), substitute— (1) This section applies where a...

        7. 7.(1) For section 33C(1), substitute— (1) This section applies where—...

        8. 8.(1) Section 34 is amended as follows.

        9. 9.In section 34B— (a) in subsection (2)(a) after “committed” insert...

        10. 10.Omit sections 35 to 43.

        11. 11.In section 44— (a) in subsection (1)(a), omit “or”;

        12. 12.In section 44A, after subsection (8), insert—

        13. 13.In section 57— (a) in subsection (1) for “waste management...

        14. 14.In section 59— (a) in subsection (1) after “section 33(1)...

        15. 15.In section 59ZA(2) after the words “section 33(1) above” add...

        16. 16.In section 59A, after subsection (3), insert—

        17. 17.Omit sections 64 to 66, 74 and 77.

        18. 18.In section 78YB— (a) for subsections (1) to (2C) substitute—...

        19. 19.Town and Country Planning Act 1990

        20. 20.Water Industry Act 1991

        21. 21.Water Resources Act 1991

        22. 22.Clean Air Act 1993

        23. 23.Environment Act 1995

        24. 24.Goods Vehicles (Licensing of Operators) Act 1995

        25. 25.Finance Act 1996

        26. 26.Pollution Prevention and Control Act 1999

        27. 27.Finance Act 2000

      2. PART 2 Subordinate legislation

        1. 28.The Regulations as to Cremation (1930)

        2. 29.The Deposits in the Sea (Exemptions) Order 1985

        3. 30.The Radioactive Substances (Hospitals) Exemption Order 1990

        4. 31.The Controlled Waste (Registration of Carriers and Seizure of Vehicles) Regulations 1991

        5. 32.The Environmental Protection (Duty of Care) Regulations 1991

        6. 33.The Controlled Waste Regulations 1992

        7. 34.The Waste Management Licensing Regulations 1994

        8. 35.The Conservation (Natural Habitats, &c.) Regulations 1994

        9. 36.The Waste Management Licensing (Amendment etc.) Regulations 1995

        10. 37.The Landfill Tax Regulations 1996

        11. 38.The Waste Management Licensing (Amendment) Regulations 1998

        12. 39.The Groundwater Regulations 1998

        13. 40.The Water Protection Zone (River Dee Catchment) Designation Order 1999

        14. 41.The Control of Pollution (Oil Storage) (England) Regulations 2001.

        15. 42.The Chemicals (Hazard Information and Packaging for Supply) Regulations 2002

        16. 43.The End-of-Life Vehicles Regulations 2003

        17. 44.The Water Environment (Water Framework Directive) (England and Wales) Regulations 2003

        18. 45.The Hazardous Waste (England and Wales) Regulations 2005

        19. 46.The Hazardous Waste (Wales) Regulations 2005

        20. 47.The Volatile Organic Compounds in Paints, Varnishes and Vehicle Refinishing Products Regulations 2005

        21. 48.The Greenhouse Gas Emissions Trading Scheme Regulations 2005

        22. 49.The Contaminated Land (England) Regulations 2006

        23. 50.The Contaminated Land (Wales) Regulations 2006

        24. 51.The Waste Electrical and Electronic Equipment Regulations 2006

        25. 52.The Producer Responsibility Obligations (Packaging Waste) Regulations 2007

        26. 53.The Waste Management (Miscellaneous Provisions) (England and Wales) Regulations 2007

        27. 54.The Transfrontier Shipment of Waste Regulations 2007

        28. 55.The Large Combustion Plants (National Emission Reduction Plan) Regulations 2007

    22. SCHEDULE 22

      Revocations

    23. SCHEDULE 23

      Repeals

  10. Explanatory Note

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources