Search Legislation

The Air Quality Standards Regulations 2007

Status:

This is the original version (as it was originally made).

  1. Introductory Text

  2. PART 1

    1. 1.Citation, commencement and application

    2. 2.Definitions

    3. 3.Designation of Secretary of State

  3. PART 2

    1. CHAPTER 1

      1. 4.Preliminary and application

      2. 5.Zones and agglomerations

      3. 6.Air quality standards

    2. CHAPTER 2

      1. 7.General attainment measures

      2. 8.Improvement plans

      3. 9.Other improvement measures

    3. CHAPTER 3

      1. 10.Maintenance of air quality standards

      2. 11.Action plans

    4. CHAPTER 4

      1. 12.Duty to assess air quality

      2. 13.Assessment methods

      3. 14.Fixed and combined measurement

      4. 15.Sampling points

      5. 16.Other assessment requirements

  4. PART 3

    1. 17.Measurement of PM2.5

    2. 18.Measurement of ozone precursor substances

    3. 19.Monitoring of polycyclic aromatic hydrocarbons

    4. 20.Background monitoring

  5. PART 4

    1. 21.General requirements

    2. 22.Information regarding zones

    3. 23.Information on concentrations

    4. 24.Information on breach of alert or information threshold

    5. 25.Information on breach of air quality standards

    6. 26.Ozone annual report

    7. 27.Information on action and improvement plans

    8. 28.Public participation in improvement plans

  6. PART 5

    1. 29.Transboundary pollution

    2. 30.Power to give directions

    3. 31.Collation of information etc

    4. 32.Revocations

  7. Signature

    1. SCHEDULE 1

      Air quality standards

      1. PART 1 Limit values for Group A pollutants

      2. PART 2 Margins of tolerance for benzene and nitrogen dioxide

      3. PART 3 Target values for Group B pollutants

        1. 1.The target values in the following table in each case...

        2. 2.The attainment date for each of these target values is...

      4. PART 4 Target values and long-term objectives for ozone

        1. 3.In this Part— (a) all values shall be expressed in...

    2. SCHEDULE 2

      Information to be included in an Improvement Plan

      1. 1.Localisation of excess pollution— (a) region; (b) city (map); and...

      2. 2.General information— (a) type of zone (city, industrial or rural...

      3. 3.Responsible authorities (names and addresses of persons responsible for the...

      4. 4.Nature and assessment of pollution— (a) concentrations observed over previous...

      5. 5.Origin of pollution— (a) list of the main emission sources...

      6. 6.Analysis of the situation— (a) details of those factors responsible...

      7. 7.Details of those measures or projects for improvements which existed...

      8. 8.Details of those measures or projects adopted with a view...

      9. 9.Details of the measures or projects planned or being researched...

      10. 10.List of the publications, documents, and work used to supplement...

    3. SCHEDULE 3

      Alert and information thresholds

      1. PART 1 Alert thresholds for nitrogen dioxide and sulphur dioxide

      2. PART 2 Alert and information thresholds for ozone

    4. SCHEDULE 4

      Assessment thresholds

      1. PART 1 Assessment thresholds for Group A pollutants

      2. PART 2 Assessment thresholds for Group B pollutants

      3. PART 3 Determination of representative concentrations

        1. 1.The representative concentration of the relevant pollutant shall be determined...

        2. 2.Where fewer than five years’ data are available, measurement campaigns...

    5. SCHEDULE 5

      Minimum number of sampling points

      1. PART 1 Group A pollutants: human health based limit values and alert thresholds

        1. 1.This Part sets out the minimum number of sampling points...

        2. 2.Point sources

      2. PART 2 Group A pollutants: limit values for the protection of ecosystems or vegetation

        1. 3.The following table sets out the minimum number of sampling...

        2. 4.In island zones the number of sampling points for fixed...

      3. PART 3 Group B pollutants

        1. 5.This Part sets out the minimum number of sampling points...

        2. 6.Point sources

      4. PART 4 Ozone

        1. 7.The minimum number of sampling points for fixed measurement of...

      5. PART 5 Ozone: minimum number of sampling points for fixed measurements for zones attaining the long-term objectives

        1. 8.In cases where zones attain the long-term objectives, the number...

        2. 9.The number of stations located in agglomerations and other zones...

        3. 10.The number of rural background stations shall be 1 per...

    6. SCHEDULE 6

      Location of sampling points

      1. PART 1 Macroscale siting for Group A pollutants

        1. 1.Sampling points for the protection of human health

        2. 2.Sampling points shall in general be sited to avoid measuring...

        3. 3.Sampling points shall also, where possible, be representative of similar...

        4. 4.Account shall be taken of the need to locate sampling...

        5. 5.Protection of ecosystems and vegetation

      2. PART 2 Macroscale siting for Group B pollutants

        1. 6.The sites of sampling points shall be selected in such...

        2. 7.Sampling points shall in general be sited so as to...

        3. 8.Where the objective is to assess background levels the sampling...

        4. 9.Where contributions from industrial sources are to be assessed, at...

        5. 10.Sampling points shall also, where possible, be representative of similar...

      3. PART 3 Macroscale siting for ozone

        1. 11.Sampling points for ozone shall be located in accordance with...

        2. 12.For rural and rural background stations, consideration shall be given,...

      4. PART 4 Microscale siting

        1. 13.The following guidelines shall be met as far as practicable—...

        2. 14.The following factors may also be taken into account—

      5. PART 5 Documentation and review of site selection

        1. 15.The site-selection procedures shall be fully documented at the classification...

        2. 16.For ozone, this requires screening and interpretation of the monitoring...

    7. SCHEDULE 7

      Requirements for assessment methods other than fixed measurement

      1. PART 1 Group A pollutants

        1. 1.The following information shall be compiled for zones within which...

        2. 2.Where possible maps shall be compiled showing concentration distributions within...

      2. PART 2 Group B pollutants

        1. 3.Requirements for air quality models

        2. 4.Requirements for objective estimation techniques

        3. 5.Standardisation

      3. PART 3 Ozone and ozone precursor substances

        1. 6.The following information shall be compiled for zones within which...

        2. 7.The Secretary of State shall ensure that maps are compiled...

    8. SCHEDULE 8

      Data quality objectives

      1. PART 1 Group A pollutants and PM2.5

        1. 1.Group A pollutants (other than benzene and carbon monoxide) and PM2.5

        2. 2.The accuracy of the measurement is defined as that set...

        3. 3.The accuracy for modelling and objective estimation is defined as...

        4. 4.The requirements for minimum data capture and time coverage do...

        5. 5.The Secretary of State may allow for random measurements to...

        6. 6.Benzene and carbon monoxide

        7. 7.The uncertainty (on a 95% confidence interval) of the assessment...

        8. 8.The uncertainty for modelling and objective estimation is defined as...

        9. 9.The requirements for minimum data capture and time coverage do...

        10. 10.The Secretary of State may allow for random measurements to...

      2. PART 2 Group B pollutants, polycyclic aromatic hydrocarbons and total gaseous mercury

        1. 11.The data quality objectives set out in the following table...

        2. 12.The uncertainty (expressed at a 95 % confidence level) of...

        3. 13.The requirements for minimum data capture and time coverage do...

        4. 14.The Secretary of State may allow for use of wet...

        5. 15.The Secretary of State may apply a minimum time coverage...

      3. PART 3 Ozone and nitrogen dioxide assessed at ozone sampling points

        1. 16.The data quality objectives set out in the following table,...

        2. 17.The uncertainty (on a 95% confidence interval) of the measurement...

        3. 18.The uncertainty for modelling and objective estimation means the maximum...

        4. 19.“Time coverage” means the percentage of time considered for settling...

        5. 20.“Data capture” means the ratio of the time for which...

        6. 21.The requirements for minimum data capture and time coverage do...

    9. SCHEDULE 9

      Reference methods

      1. PART 1 Group A pollutants

      2. PART 2 Group B pollutants in ambient air

      3. PART 3 Ozone

      4. PART 4 Other reference methods

    10. SCHEDULE 10

      Ozone precursor substances

      1. 1.Objectives

      2. 2.An additional aim is to support the understanding of ozone...

      3. 3.Substances

      4. 4.The Secretary of State shall, in particular, consider measuring the...

      5. 5.Reference methods

      6. 6.Monitoring sites

    11. SCHEDULE 11

      Public information where alert or information thresholds are exceeded

      1. PART 1 Alert thresholds for nitrogen dioxide and sulphur dioxide

        1. 1.In cases where the alert thresholds for nitrogen dioxide or...

      2. PART 2 Alert and information thresholds for ozone

        1. 2.In cases where either the information threshold or the alert...

        2. 3.Information on any observed exceedance— (a) the location or area...

        3. 4.Forecast for the following afternoon, day or days—

        4. 5.Information on the type of population concerned, possible health effects...

        5. 6.Information provided under this Schedule shall also include—

    12. SCHEDULE 12

      Collation of information and criteria for aggregating data and calculating statistical parameters

      1. PART 1 Information to be submitted to the Commission

        1. 1.The following information on ozone concentrations shall be obtained and...

        2. 2.The Secretary of State shall also ensure that the following...

        3. 3.Data compiled in monthly reports shall be considered provisional and...

      2. PART 2 Criteria for aggregating data and calculating statistical parameters

        1. 4.In this Part, percentiles are to be calculated using the...

        2. 5.The following criteria are to be used for checking validity...

  8. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources