THE SCHEDULE TO THE SCHEME
PLANS AND SPECIFICATIONS OF THE BRIDGE TO BE CONSTRUCTED OVER THE RIVER CLWYD, AS PART OF THE A525 RHUDDLAN BYPASS STAGE II
1.Location — The River Clwyd south-west of the Town of...
2.Points of Commencement and Termination — From a point on...
3.Main Span — 41.64 metres minimum clear square span.
4.Headway — 8.0 metres minimum above water level of 2.8...
5.Approach Spans — Single spans each of 40.0 metres to...
6.Waterway — As existing.
7.Construction — The bridge will consist of an eleven span...
8.Plans — The position and general design of the bridge...