| | SCHEDULE 5 WITH KEY PLAN AND SITE PLAN
PLANS AND SPECIFICATIONS FOR THE BRIDGE CROSSING THE BRIDGEWATER CANAL AT LYMM
Points of Commencement and Termination From a point south of the centreline of the Bridgewater Canal in the Borough of Warrington in the County of Cheshire 25 metres south west from the easternmost column of the northern pier of the Bridgewater Canal Bridge and 23 metres south east from the westernmost column of the northern pier of the Bridgewater Canal Bridge.
To a point north of the centreline of the Bridgewater Canal 15 metres north west from the easternmost column of the southern pier of the Bridgewater Canal Bridge and 34 metres north east from the westernmost column of the southern pier of the Bridgewater Canal Bridge.
Construction Composite steel girder and reinforced concrete deck on reinforced concrete piers.
Headroom 3.7 metres minimum headroom above Normal Canal Water Level.
| |