The Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003 Confirmation Instrument 2004 © Crown Copyright 2004 Scottish Statutory Instruments printed from this website are printed under the superintendence and authority of the Controller of HMSO being the Queen's Printer of Acts of Parliament. The legislation contained on this web site is subject to Crown Copyright protection. It may be reproduced free of charge provided that it is reproduced accurately and that the source and copyright status of the material is made evident to users. It should be noted that the right to reproduce the text of Scottish Statutory Instruments does not extend to the Queen's Printer for Scotland imprints which should be removed from any copies of the Scottish Statutory Instrument which are issued or made available to the public. This includes reproduction of the Scottish Statutory Instrument on the Internet and on intranet sites. The Royal Arms may be reproduced only where they are an integral part of the original document. The text of this Internet version of the Scottish Statutory Instrument has been prepared to reflect the text as it was Made. A print version is also available and is published by The Stationery Office Limited as the The Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003 Confirmation Instrument 2004, ISBN 0110694929. The print version may be purchased by clicking here. Braille copies of this Scottish Statutory Instrument can also be purchased at the same price as the print edition by contacting TSO Customer Services on 0870 600 5522 or e-mail: customer.services@tso.co.uk. Further information about the publication of legislation on this website can be found by referring to the Frequently Asked Questions. To ensure fast access over slow connections, large documents have been segmented into "chunks". Where you see a "continue" button at the bottom of the page of text, this indicates that there is another chunk of text available.
The Scottish Ministers, in exercise of the powers conferred by section 75(3)(a) of the Roads (Scotland) Act 1984[1] and of all other powers enabling them in that behalf, after having given due consideration to the reasonable requirements of navigation in accordance with section 76(1) of the said Act and having complied with the provisions of Part II of Schedule 1 to the said Act[2], hereby make the following Instrument: Citation, commencement and interpretation 1. This Instrument may be cited as the Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003 Confirmation Instrument 2004 and shall come into force on 12th March 2004. 2. In this Instrument "the Scheme" means the Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003. Confirmation of the scheme 3. The Scheme is confirmed. 4. The Scheme as confirmed, the specification of the replacement bridge and the specification of the temporary bridge are set out in the Schedule to this Instrument. KENNETH HOGG A member of the staff of the Scottish Ministers Victoria Quay, Edinburgh 11th March 2004 Angus Council, in exercise of the powers conferred on them by Section 75(3)(a) of the Roads (Scotland) Act 1984, and all other powers enabling them in that behalf, hereby make the following Scheme: 1. This Scheme may be cited as the "The Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003". 2. Angus Council, as roads authority for the area of Angus, is hereby authorised to construct, as part of a public road, a replacement bridge along the line of the existing bridge described in Schedule 1 hereto over the navigable waters of the River South Esk by means of this Scheme, in accordance with Schedule 1 hereto and the road carried by such a replacement bridge shall become a public road on the date the said road is open to traffic. 3. Angus Council, as roads authority aforesaid, is hereby authorised to construct, as part of a public road, a temporary bridge, upstream of the existing bridge described in Schedule 2 hereto over the navigable waters of the River South Esk by means of this Scheme in accordance with Schedule 2 hereto and the road carried by such a temporary bridge shall become a public road on the date the said road is open to traffic. SCHEDULE 1 TO THE SCHEME SPECIFICATION OF REPLACEMENT BRIDGE OVER THE RIVER SOUTH ESK, MONTROSE Points of Commencement and Termination The replacement bridge will be constructed on the line of the existing A92 road bridge for a length of 146 metres or thereby from Bridge Street to Rossie Island Road as shown delineated in red on drawing no. 405 entitled "The Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003 Replacement Bridge Location Plan" annexed and executed as relative hereto. Span The replacement bridge will consist of 3 spans, a central span of 66 metres, and 2 side spans each of 40 metres shown on drawing no. 841526/03/2/1101/Rev.8 entitled "The Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003" annexed and signed as relative hereto. Headway Free headway above the 66 metre wide central span is shown on the said drawing no. 841526/03/2/1101/Rev.8 and will form the existing navigable channel of the River South Esk. Waterway The bridge is a perpendicular crossing, navigation channel 66 metres width as shown on the said drawing no. 841526/03/2/1101/Rev.8. SCHEDULE 2 TO THE SCHEME SPECIFICATION OF TEMPORARY BRIDGE OVER THE RIVER SOUTH ESK, MONTROSE Points of Commencement and Termination The temporary bridge will be located 10m to the west (upstream side) of the existing bridge for a length of 170 metres or thereby from Bridge Street to Esk Road as shown delineated in red on the said drawing no. 406 entitled "The Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003 Temporary Bridge Location Plan". Public traffic will be diverted on to this bridge in advance of the demolition of the existing 1931 bridge. On completion of the replacement bridge, the public traffic will be transferred to the replacement bridge and the temporary bridge will be taken down. It is envisaged that the temporary bridge will be in place for 12 months. Span The temporary bridge will consist of 14 no. 12 metre spans shown on drawing no. E/E02010/10/Rev.D entitled "The Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003 Temporary Bridge" annexed and signed as relative hereto. Headway Free headway above the 12 metre wide spans is shown on the said drawing no. E/E02010/10/Rev.D and will form the temporary navigable channel of the River South Esk. Waterway The bridge is a perpendicular crossing, navigation channel 12 metres width as shown on the said drawing no. E/E02010/10/Rev.D. (This note is not part of the Instrument) This Instrument confirms the Angus Council A92 Montrose Bridge Replacement Bridge Scheme 2003. Copies of the Scheme and the accompanying plans have been deposited and may be inspected during business hours at the Planning Department Reception, Angus Council, St. James House, St. James Road, Forfar and at Montrose Library, 216 High Street, Montrose. Notes: [1] 1984 c.54. The functions of the Secretary of State were transferred to the Scottish Ministers by virtue of section 53 of the Scotland Act 1998 (c.46).back [2] Part II of Schedule 1 was amended by the Local Government etc. (Scotland) Act 1994 (c.39), Schedule 13, paragraph 135(11)(b), by regulation 52 of the Environmental Impact Assessment (Scotland) Regulations 1999 (S.S.I. 1999/1) and by the Water Industry (Scotland) Act 2002 (asp 3), Schedule 7, paragraph 14(6)(a).back
ISBN 0 11 069492 9
|
|
Other Scottish Statutory Instruments | UK Statutory Instruments | Home | Her Majesty's Stationery Office | ||
| We welcome your comments on this site | © Crown copyright 2004 | Prepared 24 March 2005 |