Section 7 Addition or modification of operations requiring consent: urgent situations

57.This section sets out the detail of a special procedure whereby SNH may, having obtained the consent of the Scottish Ministers, alter an ORC list for a site with immediate effect. This is an emergency measure which allows an unlisted operation to be added to the ORC list at very short notice where it becomes apparent that damage to the site may result if the unlisted operation is carried out. SNH may also modify any existing entry on the ORC list in the same way (so that, for example, the existing entry is extended sufficiently to cover the operation which is posing a threat to the site).

58.SNH is limited in its power to change the ORC list on an emergency basis by subsection (2). This requires SNH to make a case to the Scottish Ministers explaining why it considers the alteration to the ORC list is necessary and why it considers the situation to be one of urgency. SNH cannot make the change to the ORC list unless the Scottish Ministers consent.

59.The effect of a change to the ORC list by means of section 7 is that the owner or occupier will be required to seek consent from SNH for an operation which may have previously been lawful. On receipt of an application for consent SNH may then be willing to allow the operation to proceed subject to conditions, or it may refuse consent. Applications for consent to carry out ORCs are dealt with in section 16 and appeals procedures are set out in section 18.

Section 8 Variation of SSSI notifications

60.This section enables SNH to vary certain aspects of the SSSI notification following the point at which the SSSI notification, and therefore the SSSI, has been confirmed under the terms of paragraph 10 of Schedule 1.

61.This section allows SNH to vary the description of the land and the list of features of special interest, as well as any miscellaneous "other information" contained in the SSSI notification by virtue of section 3(4)(a)(iv). It does not however allow SNH to vary the boundary of the SSSI (e.g. by enlarging the site) or alter the list of ORCs for the site. Separate procedures are provided in sections 5 and 6 in relation to these components of the SSSI notification.

Section 9 Denotification of sites of special scientific interest

62.This section provides a process by means of which an existing SSSI (or any part of an existing SSSI) may be denotified. The procedure set out in this section is in essence the reverse of the notification process specified in section 3. SNH must first determine that a site (or part of a site) is no longer of special interest, having applied essentially the same criteria as used for site selection and notification and restated in section 9(3). This includes a requirement to consider the contribution which the site makes to the SSSI series as a whole, both in relation to the natural features of Scotland and to those of Great Britain and of the member States of the European Union.

63.Having determined that the site, or part of the site, no longer satisfies those criteria, SNH must then give a revocation or modification notification to the interested parties in the same way as for an initial notification. In the case of a denotification, however, the information given to the interested parties, rather than detailing the special interest of the site, must set out SNH's reasons for regarding the site or part of it as no longer being of special interest.

64.Where part only of the site is to be denotified, the interested parties are those individuals and bodies specified in section 48(2) who have an interest in relation to the particular part of the site which is to be denotified. SNH is not required to notify parties who have an interest in relation to other parts of the site only, although section 48(2)(k) gives it power to do so (and to inform other individuals and organisations who are not otherwise interested parties) where it may be appropriate to inform a wider audience of the proposed change. As with enlargement (see section 5), the denotification process is sufficiently flexible to cover scenarios ranging from the denotification of an entire site through to minor adjustments to the boundary of an SSSI.

Section 10 Notifications relating to sites of special scientific interest: procedure

65.This section introduces Schedule 1, which sets out procedures to be followed in relation to the notification of SSSIs under section 3(1), and their subsequent enlargement (section 5) or denotification (section 9).

Schedule 1

Notifications relating to sites of special scientific interest: procedure

Application of Schedule

66.Paragraph 1 applies Schedule 1 to the notification of SSSIs under section 3(1), the notification of enlargements under section 5 and the denotification of SSSIs under section 9.

Publication

67.Paragraph 2 ensures that SNH must publish information describing the general effect of notifications under sections 3(1), 5(1) and 9(1). The objective is to ensure that the general public should reasonably be aware that an SSSI is being created, enlarged or removed. The minimum requirement is that information should be published in a local newspaper circulating in the area in which the SSSI is situated. SNH also has discretion as to other means of publicising the notification. The SNH website could, for example, provide a key mechanism for making such information publicly available. This provision allows SNH to give consideration to and to use other appropriate means designed to bring notifications are brought to the attention of a wider audience.

Content of notification

68.Paragraph 3 details the information which must be given to the interested parties when SNH provides notification of an SSSI, its enlargement or denotification and which must also be contained in the related notice required under paragraph 2.

69.It is a requirement of paragraph 3 that any such notification, and any notice published under paragraph 2 in the press, on the internet or elsewhere, must name a place where the full notification can be inspected free of charge at any reasonable time and from where a copy of the relevant documentation can be obtained or purchased.

70.Paragraph 3(c) ensures that SSSI notifications, notifications of enlargement and denotifications, and related notices give information about the right to make representations to SNH. The formal date of notification is defined in section 48(2) and the deadline for the submission of representations cannot be less than 3 months after this date. SNH must also specify the manner in which representations are to be made (including, for example, the address to which they are to be sent and whether representations can be made by e-mail as well as by letter).

Confirmation or withdrawal of notification

71.Paragraph 4 requires that an SSSI notification, notification of enlargement or denotification must be formally confirmed or withdrawn by SNH within one year of the date on which it was given. Provision is made to allow the period of one year to be extended in accordance with arrangements set out in paragraph 12. SNH is obliged to consider any representations which have been made in relation to the notification before confirming it. As noted above, representations must be made within the period specified in the notification and in the notice given under paragraph 2 which, by virtue of paragraph 3(c), cannot be less than 3 months.

72.Paragraph 5 deals with the situation in which SNH fails to confirm a notification within the one year period (or within any period as extended by virtue of paragraph 12). If a notification is not formally confirmed by the deadline, it is to be treated as if it had been withdrawn by SNH on the day on which the period allowed for confirmation expired. In such circumstances the notification no longer has any effect and the SSSI ceases to exist. It should, however, be noted that a failure to confirm the notification does not invalidate any effects it may have had during the period prior to non-confirmation - for example, if decisions under regulatory regimes or the planning system had been influenced by the existence of the SSSI.

Modification of notification

73.Paragraphs 6 to 8 enable SNH to modify a notification prior to confirmation. Notifications may be modified by amending the matters specified in the SSSI notification (defined in section 3(4)) and SNH is accorded a degree of flexibility in this connection during the period prior to the notification being confirmed.

74.Thus the description of the land, the natural features which are of special interest or the miscellaneous other information included in the SSSI notification may be added to, removed or amended. This may, for example, be done where SNH requires to correct part of the notification or accepts a particular point made by an objector. SNH may also amend the boundaries of the site to reduce its coverage, for example, where it considers that a particular area should in fact be excluded from the site. SNH is not however permitted to use its pre-confirmation power of modification to extend the boundaries of the site or to add to the ORC list. Separate procedures exist in sections 5, 6 and 7 to allow changes to these particular components of the SSSI notification. These powers can be used before as well as after confirmation.

Referral to Advisory Committee

75.Paragraph 9 , together with section 21(6) to (8), sets out SNH's obligations in situations where representations (including objections to the site) have been lodged in accordance with paragraph 3(c).

76.Where any valid representation has been received and it relates to the natural features specified in the notification (e.g. it is an objection concerning the appropriateness or accuracy of the information contained in an SSSI notification by virtue of section 3(4)(a)(ii) or it concerns SNH's reasons for considering a site no longer to be of special interest) SNH cannot then confirm the notification until it has referred the representation to the Advisory Committee on SSSIs ("ACSSSI) and considered any advice received from ACSSSI.

77.The role and operations of ACSSSI are defined in section 21 (for which see paragraphs 153 to 162 of these notes ). The need to allow sufficient time for ACSSSI to consider objections, and for SNH properly, in turn, to consider ACSSSI's advice, prior to expiry of the deadline for confirmation of the SSSI was one of the key reasons for extending the confirmation period from 9 months (under the 1981 Act) to one year (under this Act).

Notice of decision to confirm or withdraw

78.Paragraph 10 obliges SNH to give formal notice of any decision to confirm or withdraw a notification. Notice must be given to the interested parties (see section 48(2)) and must be publicised, including in at least one local newspaper and by any other means which SNH thinks fit, in accordance with the requirements of paragraph 2. A failure to give such notice within the deadline for confirmation leads, by virtue of paragraph 5, to the notification being deemed to have been withdrawn.

79.Paragraph 11 deals with the situation in which an objection to the notification has been referred to ACSSSI. In such cases the person who lodged the objection must be provided not only with notice of the confirmation or withdrawal of the notification but must also be given a copy of the advice which ACSSSI had given to SNH in relation to the matters raised by that objector.

Extension of period during which notification is to be confirmed or withdrawn

80.Paragraphs 12 and 13 provide for the extension of the period within which a notification must be formally confirmed or withdrawn. An extension may be made in the event of a referral to ACSSSI, but the extension can be for no more than an additional 6 month period. Thus the notification is required, in most situations, to be confirmed or withdrawn within no more than 18 months of the date on which it was originally given. If this does not happen it will be deemed (by virtue of paragraph 5) to have been withdrawn.

81.Where no objections have been received which are required under section 21 to be referred to ACSSSI, paragraph 13 does however allow for the period for confirmation or withdrawal to be extended for an unspecified period where this is by mutual agreement between SNH and all owners and occupiers of land within the SSSI in question. In such circumstances confirmation could take longer than 18 months. Such an agreement may, for example, be reached where SNH is engaged in constructive but very detailed negotiations with owners and occupiers and they are content with the progress of those negotiations.

82.Paragraph 14 specifies the manner in which agreement to an extension of the period for confirmation or withdrawal is to be obtained by SNH. Agreement is given either where every owner and occupier explicitly consents or where no reasonable objection is received within 28 days of SNH making a proposal for extension. The concept of reasonableness is applied here in order to prevent one individual from blocking an extension for petty reasons and thereby thwarting the wishes of the overwhelming majority of owners and occupiers of the site. A similar principle applies elsewhere in the Act, for example in relation to the review of ORC lists (see section 6(3)(b)).

83.Paragraph 15 requires SNH to inform the interested parties of any extension to the period for confirmation or withdrawal. This is particularly relevant to the situation foreseen in paragraph 14(b) where no reasonable objection is received.

Section 11 Effect of SSSI notification

84.Subsection (1) defines the point at which modifications to an SSSI notification, or alterations made to an SSSI notification by virtue of sections 5 to 9, take effect. Original SSSI notifications have effect from the date on which they are given (see sections 3(6) and 48(2)) and they have effect in their modified or amended form as of the date on which notice of the relevant change is given.

85.Subsection (2) provides that, where SNH gives notice (under paragraph 10 of Schedule 1) that it has withdrawn a notification of enlargement (given under section 5(1)), the original SSSI notification continues to have effect in its unaltered, original form. In other words, the notification reverts to the status quo ante and the situation continues as if the proposal for enlargement had never been made. It should be noted that this does not invalidate the effects which any notification given under section 5(1) may have had during the period between notification and withdrawal - for example where a decision by a regulatory body or under the planning system may have been influenced by the notice of enlargement.

86.Subsection (3) provides that an SSSI notification ceases to have effect when SNH gives notice (under paragraph 10 of Schedule 1) of its decision to withdraw the SSSI notification. It also provides that a denotification of a whole SSSI does not, in contrast to a partial denotification, have effect until the relevant notification under section 9(1) is confirmed. A default arrangement covering the situation in which SNH fails to take a decision is covered separately in paragraph 5 of Schedule 1.

Exercise of functions in relation to sites of special scientific interest

Section 12 Exercise of functions by public bodies etc.

87.Section 12 applies to the exercise by a public body of any function on, or so far as affecting, any land which is of SSSI status.

88.This general duty is therefore invoked whenever a public body exercises a function in relation to any part of the SSSI series, whether the function affects a part of one SSSI, the whole of an SSSI or a variety of areas of land on a number of different SSSIs. In essence, public bodies must comply with the obligations set out in section 12 wherever their policies or operations impinge on, or are likely to affect, SSSI land.

89.Subsection (2) requires public bodies to:

  • consult SNH in relation to the exercise of the function;
  • have regard to any advice received from SNH as a result of such consultation; and
  • take reasonable steps, when exercising the function, to both further the conservation and enhancement of protected natural features and to maintain and enhance the representative nature of SSSI series as a whole.

90.As with the biodiversity duty in section 1, the general duty in relation to SSSIs does not override other statutory obligations. Public bodies must still carry out their primary functions in a proper and effective manner. But in doing so they must also act to further the conservation, maintenance and enhancement of individual SSSIs and the wider SSSI series.

91.Subsection (3) ensures that the relationship between the general duty in section 12 and the more specific obligations in sections 13 to 15 is clear. Compliance with section 12 does not absolve a public body from the need to comply with the more detailed requirements regulating specific operations which are likely to damage any natural feature for which an SSSI has been notified. The provisions of both section 12 and sections 13 to 15 must be complied with. Section 12 is an overarching duty. Sections 13 to 15 describe how to deal with situations in which specific operations are likely to damage an SSSI. The interplay between section 12 and sections 13 to 15 is particularly important where a public body is considering the option to proceed with an operation against SNH advice. In such cases, the public body remains bound by its general obligation under section 12 (for which see section 14(3)(c)).

Operations affecting sites of special scientific interest

Section 13 Operations by public bodies etc.

92.Subsection (1) prohibits a public body from carrying out any operation which is likely to damage any natural feature by reason of which an SSSI notification has effect, unless certain conditions are met. These are that either:

  • SNH has given explicit written consent to the operation in accordance with section 13(4);
  • the provisions of section 14(1) apply (i.e. consent has effectively been given in some other form or the operation is necessary in an emergency); or
  • the provisions of section 14(2) apply (i.e. the operation satisfies the conditions set out in subsection (3) allowing the public body to proceed in the face of a refusal of consent by SNH).

93.Contravention, without reasonable excuse, of this section is a criminal offence under section 19.

94.Subsection (2) provides that the obligations imposed by subsection (1) apply whether or not the operation would take place on land within an SSSI. This means that operations by a public body which would be likely to damage the protected natural features of an SSSI are controlled under section 13 even where they take place outwith the formal boundary of the site. What matters is whether the operation is likely to damage the protected natural features. Where the operation is taking place is not relevant.

95.It is important to note in this context that public bodies, unlike private land managers, are required to do more than merely seek consent for operations on the formal ORC list for a site. The effect of not limiting this provision to ORCs is intended to require public bodies need to be more pro-active in their approach. Public bodies must, for example, assess potential risks to any SSSI (including an SSSI on adjacent land to that on which they intend to carry out operations) when planning and carrying out any operation. In this sense, public bodies must take responsibility for anticipating any potential threat to a site, whilst private owners and occupiers are not obliged by section 16 to think beyond the ORC list notified to them by SNH or to consider the impacts of their activities on a neighbouring SSSI. The activities of public bodies are regulated by sections 13 and 14. For more on the position of private owners and occupiers, see the notes on section 16, below.

96.Subsection (3) requires that an application for SNH's consent to an operation must specify the nature of the operation, provide details of the proposed dates on which the operation will start and finish, and define the land on which the public body proposes to carry out the operation.

97.Subsection (4) provides that where SNH has received an application as specified under subsection (3), it may either consent to the operation or refuse its consent. Where SNH consents to the operation it is entitled to do so subject to such conditions as it sees fit.

98.Subsection (5) makes it explicit that any conditions imposed under subsection (4) can, in particular, restrict the manner in which the operation is to be carried out or specify that the operation may only be carried out on part of the land in question. SNH may also stipulate that the operation can only be carried out for, or within, a certain period of time (for example, outwith the breeding season for important species). The types of conditions which may be imposed by SNH are not however limited to the examples given in subsection (5).

99.Subsection (6) obliges SNH to provide written advice to the public body when giving or refusing consent to an operation. Such advice must include advice on how to minimise the type of damage to the protected natural feature by reason of which an SSSI notification has effect. The provision of such advice is not optional and this section ensures that SNH will provide appropriate conservation and ecological advice and guidance to other public bodies which will allow them to carry out a permitted operation in the most appropriate and least damaging manner.

100.Subsection (7) requires SNH to provide reasons for either refusing consent or giving consent subject to conditions. This is intended to ensure the transparency and openness of decision-making and to make it easier for decisions by SNH to be challenged by the public body in question where it believes SNH has wrongly refused consent or imposed unreasonable conditions.

101.Subsection (8) ensures certainty by deeming any application for consent under section 13 to have been refused if SNH has failed to respond within 28 days of the date of application. Where SNH neither gives nor refuses consent, and the application is therefore treated as having been turned down, the public body has the option of proceeding under section 14(2)(a).

Section 14 Operations by public bodies etc.: authorised operations

102.Subsection (1) sets out details of the situations in which SNH consent to an operation is not required by a public body. These are effectively situations in which consent has already been given via another route, or where action is necessary in an emergency. The particular circumstances are where:

  • permission has already been given by a regulatory authority under section 15. The regulator is obliged under section 15 to have regard to SNH advice before giving permission and this subsection obviates the need for SNH to give separate permission for the operation. SNH consent is contained within the regulatory permission;
  • explicit planning permission has been granted. Again, SNH advice is taken into account by the planning authority and separate permission from SNH for the operation is not required by this subsection. It should be noted that this exemption applies only to the explicit grant of planning permission and does not remove the need to obtain SNH permission for an operation undertaken as a permitted development for which planning permission is not needed;
  • an operation is carried out in order to deal with an emergency situation. This exemption can only be invoked where SNH is informed as soon as possible after the need for the emergency operation becomes clear;
  • an operation is carried out in accordance with a management agreement between SNH and the public body. In concluding the agreement SNH will have consented to the operation; and
  • an operation is carried out in accordance with some other, formally-agreed plan for the management of land which has been approved in writing by SNH. For example, a forest management plan setting out a programme for forestry operations and land management activity over an extended period of time. The operations specified within such a management plan could be consented to in advance by SNH if it were to decide to approve the plan and gave such approval in writing.

103.Subsection (2) allows public bodies to proceed with an operation, in certain closely defined circumstances, even where SNH has refused consent or has imposed conditions which are unacceptable to the public body. But it may only do so where all of the conditions set out in subsection (3) have been met. It should be noted that failure by SNH to take a decision within 28 days in response to an application under section 13(3) is deemed to be a refusal of consent and the provisions of this subsection would therefore apply.

104.Subsection (3) sets out the conditions which have to be met if a public body intends to proceed with an operation in the face of SNH opposition. The conditions are that:

  • no action can be taken until the 28 day period for consideration of the original application has expired;
  • notice must be given to SNH of the proposed start date for the operation;
  • that start date cannot be less than 28 days from the date on which notice of the intention to proceed with the operation is given;
  • the notice given to SNH must set out what the public body has done, or proposes to do, in response to any advice which may have been received from SNH in relation to the operation;
  • the operation must be carried out in a manner which causes as little damage or disturbance to the natural feature specified in the SSSI notofication as is reasonably possible in all the circumstances;
  • in seeking to avoid damaging or disturbing that feature the public body must have regard to any advice received from SNH; and
  • the public body must comply with its general duty in relation to SSSIs and the SSSI series, as set out in section 12(2)(c).

105.Subsections (4) and (5) govern certain situations in which a public body proceeds with an operation and that operation causes damage to a protected natural feature. The situations in question are where the operation has been carried out on the basis of permission from a relevant regulatory authority, where it is an emergency operation and where it has been carried out in the face of a refusal of consent from SNH or where conditions imposed by SNH have been set aside. In these cases, the public body is obliged to consult with SNH on how best to restore the damaged feature and it must, so far as is reasonably practicable, then carry out that restoration work in accordance with SNH advice. Failure to do so is a criminal offence under section 19.

Section 15 Consent by certain regulatory authorities

106.Section 15 sets out the procedures to be followed where the permission of a relevant regulatory authority is needed before an operation affecting an SSSI may be carried out. Relevant regulatory authorities are to be defined for the purposes of the Act in a separate order made by the Scottish Ministers. It is not intended that planning authorities should be treated as regulatory authorities in this context, since statutory requirements for planning authorities to consult SNH in relation to planning applications already exist separately in planning legislation.

107.Subsection (3) requires a relevant regulatory authority to notify SNH before deciding whether to permit any operation which would be likely to damage a natural feature specified in an SSSI notification. Such notification to SNH must specify the nature of the operation, the proposed dates of commencement and completion, as well as the land on which it is proposed to carry out the operation.

108.Subsection (4) specifies that the obligation to consult SNH applies even if the proposed operation would take place outwith the land of an SSSI. As with section 13(2), what matters is whether the operation would be likely to damage the site, not where it is taking place. Again, the Act places a special responsibility on regulators as public bodies to anticipate and assess potential risks to SSSI land in a pro-active sense and, where they are public bodies, in accordance with the general duty set out in section 12.

109.Subsection (5) prohibits the authority from deciding whether to give its permission until 28 days have elapsed from the date of the notification to SNH under subsection (2) unless SNH has notified the authority that it does not need to wait until then. This provision is intended to ensure that SNH has sufficient time to provide advice, without unnecessarily delaying a decision if one can be taken quickly. For its part, SNH will require to be sensitive to the needs of regulators, who are themselves normally obliged to respond to applications within statutorily defined timescales.

110.Subsection (6) requires the relevant regulatory authority to have regard to any advice received by SNH when deciding to give its permission for an operation, and, where it does give its permission, in deciding whether any conditions should be attached to its permission.

111.Subsections (7) to (10) govern the situation in which a relevant regulatory authority decides not to follow advice from SNH, where that advice is not to grant permission for an operation or where it advises the regulator to impose certain conditions. Where this happens, certain conditions are imposed automatically and the regulator is obliged to inform both SNH and the applicant of the situation. This includes the requirement on the regulator - in addition to setting out the nature of the permission given and any terms and conditions - to explain what it has done, or proposes to do, in consequence of the advice given by SNH. The regulator must make it explicit that it has taken its decision in the face of SNH advice.

112.The first automatic condition imposed via subsection (10) is that the operation cannot commence before the expiry of a 28 day period from the point at which the regulator has informed SNH that its advice has not been followed. The provision for a 28 day period between notice being given to SNH and the permitted start date for the operation allows SNH time, if necessary, to seek an interdict under section 45 and/or to advise the Scottish Ministers of the situation (in which case the Scottish Ministers would also have the option of prohibiting the operation by means of a nature conservation order).

113.The obligation on the regulator to make it clear to the applicant that permission has been granted in the face of opposition from SNH is intended to ensure that the applicant is aware of the possibility that the permission could be challenged and the operation prohibited. In such circumstances the applicant may, for example, wish to avoid incurring significant expenditure in connection with the proposed operation until the situation has been more fully resolved.

114.The second condition is that the applicant is obliged, as a condition of the permission granted by the regulator, to carry out the operation in such a way as to minimise, as far as is reasonably practicable in all the circumstances, any damage or disturbance to the protected natural feature.



continue previous section


Other Explanatory Notes of the Scottish Parliament |  Home |  Acts of the UK Parliament | 
Her Majesty's Stationery Office

We welcome your comments on this site
© Crown Copyright 2004
Prepared: 21 June 2004