  • a particular electricity distribution or supply licence (subsection (1)(a))

  • a gas transporter, shipper or supply licence (subsection (1)(c))

  • standard licence conditions of those types of gas and electricity licence (subsections (1)(b) and (1)(d).

  • documents maintained under the licence conditions of relevant gas and electricity licences – for example, industry codes (subsection (1)(e)).

467.Subsection (2) sets out the scope of the modification power. It may only be exercised for the purpose of:

  • requiring licence holders to provide or install, or facilitate the provision, installation or operation of, a meter of a particular kind; or

  • requiring licence holders to make arrangements relating to such matters.

468.Subsection (3) sets out an inclusive list of various types of modifications that may be made under the new power. These include the technical specifications of the meter and provisions to allow two way communications between energy suppliers/distributors and meters installed in business or domestic premises (see paragraphs (a) and (j)).

469.Paragraph (l) makes provision for the Secretary of State to set a date from which the modification(s) come into force. This would, for example, allow the Secretary of State to set a time limit for the roll-out of smart meters.

470.Subsection (4)(a) allows the modification power to be exercised to make different provision in relation to different classes of customer (for example domestic, small business or medium/larger businesses). Subsection (4)(d) makes provision for the Secretary of State to make any incidental, supplementary, consequential or transitional modifications to licence conditions or documents of the kind mentioned in subsection (1)(e).

471.By virtue of subsection (5) the modification power may not be exercised after the end of the period of 5 years beginning with the day on which subsection (1) comes into force. Subsection (1) comes into force on the passing of the Act (see section 99(1)).

472.Subsection (6) ensures that, where the power under subsection (1) to make modifications is exercised, certain general provisions of the Gas and Electricity Acts which are relevant to this power are applicable – so that, for example, the modifications can include a requirement for the licence holder to comply with directions by the Secretary of State or the Gas and Electricity Markets Authority as to specified matters.

473.Subsection (7) states that references to a meter in any part of section 81 also include visual display units or other devices associated with or ancillary to the meter.

Section 89: Power to amend licence conditions etc: Procedure

474.This section sets out the procedure that the Secretary of State must comply with in order to exercise the modification powers conferred by section 88. Subsection (1) obliges the Secretary of State, before making modifications, to consult the holders of licences being modified, the Gas and Electricity Markets Authority and others as appropriate. This consultation may take place before or after the passing of the Act. Subsections (3) and (4) state that before making modifications the Secretary of State must lay the draft modifications before Parliament and allow a period of 40 days for either House of Parliament to reject the draft.

Section 90: Smart meters: supplemental and Schedule 5: minor and consequential amendments

475.This section makes three supplemental provisions in relation to the modification power conferred by section 88. Subsection (1) ensures that any modifications made to a standard licence condition under this power do not prevent any other part of the condition from being a standard condition. This means that the remainder of the standard condition will be subject to the rules relating to standard conditions under the Gas and Electricity Acts. Subsection (2) ensures that where licence modifications are made to standard licence conditions, the Gas and Electricity Markets Authority must make the same modifications for the purpose of future licences, and also must publish those modifications. Schedule 5 amends sections 33(1) and 81(2) of the Utilities Act 2000 so that any standard conditions which are modified under section 88(1) are incorporated as standard conditions for licences of that type.

476.Subsection (3) is an order making power for the Secretary of State to make consequential amendments to provisions made by or under an Act (including Acts of the Scottish Parliament) as he considers appropriate.

Section 91 and Schedule 4: Licensing of activities relating to smart meters

477.Part 1 of Schedule 4 inserts the following new sections into the Gas Act 1986:

  • 41HA New licensable activities: smart meters

  • 41HB Section 41HA: supplemental

  • 41HC Competitive tendering for licences for new licensable activities

478.Part 2 of Schedule 4 inserts the following new sections into the Electricity Act 1989:

  • 56FA New licensable activities: smart meters

  • 56FB Section 41HA: supplemental

  • 56FC Competitive tendering for licences for new licensable activities

Part 1: Gas

Section 41HA: New licensable activities: smart meters

479.This section gives the Secretary of State an order-making power to both create new licensable activities under section 41C of the Gas Act 1986 in relation to smart metering and to order that such new licensable activities shall cease to be licensable.

480.Subsection (2) provides that once activities become licensable, it will be an offence under section 5(1) of the Gas Act to undertake them without a licence.

481.Subsection (3) sets out the scope of the licensing power and that it may only be used to make licensable some or all of the activities connected with the provision, installation or operation of smart meters or related infrastructure or services. This could include, for example, the communications infrastructure for smart meters. Subsection (4) provides for the definition of “smart meters” to be set out in the order.

482.Subsection (5) makes provision for the order to include any necessary consequential, transitional, incidental or supplementary changes to primary legislation. This will enable the Secretary of State to add any new licensable activities to the current list of licensable activities in sections 5(1) and 7 of the Gas Act and to make other amendments necessary to ensure that the new licences fit within the existing statutory framework. Such changes could include making a provision similar to section 81(1) of the Utilities Act 2000 to specify how any new standard conditions are to come into effect and/or be suspended; and amending section 81(2) of the Utilities Act so that any modified standard conditions are incorporated as standard conditions for licences of that type. It is envisaged that the existing licensing framework and metering provisions in the Gas Act will be applied to the new licensable activities including, for example, the procedures for modification of licences in sections 23 to 27 of the Gas Act and the enforcement powers in sections 28 to 32 of the Gas Act.

483.Subsection (5)(c) makes provision for the order to specify the standard conditions for any new licensable activities and to modify any existing standard conditions of licences.

484.Subsection (6) sets out a further non-inclusive list of the type of provisions which an order creating new licensable activities could contain. This includes provision restricting the geographic scope of licences which would, for example, facilitate national or regional licensing of smart metering activities (paragraphs (a) and (b)). The order could also confer functions of the Secretary of State or the Authority which would, for example, enable the conferral of the general licensing powers in section 7B(4) to (11) of the Gas Act on the Secretary of State so that he can determine the general licence conditions for any new licences created under these powers (paragraph (e)).

485.Subsection (7) makes provision for the Secretary of State to specify how long an order will remain in force which could limit the period during which any smart metering activities are licensable.

Section 41HBSection 41HA: supplemental

486.This section sets out the procedure with which the Secretary of State must comply when making an order under section 41HA(1). Subsection (1) obliges the Secretary of State to consult the Authority and others as appropriate before making an order. By virtue of subsection (2), the power to make an order may not be exercised after the end of the period of 5 years beginning with the day on which section 41HA(1) comes into force. Section 41HA(1) comes into force on the passing of the Act (see Section 110(1)).

487.Subsection (3) provides that the affirmative procedure will apply to the order and that it will not come into force unless approved by resolution of each House of Parliament (see also Schedule 5 amending section 64(2) of the Gas Act).

488.Subsection (4) gives the Secretary of State certain supplemental powers contained in sections 47(1) to (3) of the Gas Act when making any order under section 41HA(1). These include a power to make provision for the determination of any questions of fact or law which may arise in giving effect to the order; prescribing time-limits within which things are to be done; and providing for matters under the order to be determined by specified persons and in accordance with specified procedures.

Section 41HC: Competitive tendering for licences for new licensable activities

489.This section gives the Secretary of State power to make regulations providing for the award of licences for new licensable activities connected with the provision of smart meters, by the Secretary of State or the Authority following a competitive tender procedure.

490.Subsection (3) sets out a non-inclusive list of the type of provisions which the regulations may include. The regulations may provide for the licences to be awarded by either the Secretary of State or the Authority (paragraph (a)); and may prescribe the necessary procedures for the tender process, including publication of an invitation to tender and the conditions and any restrictions governing the making of applications (paragraphs (b) to (f)).

491.The regulations may also make provision concerning how the applications for licences are to be considered and determined. In particular, the regulations may authorise or require the Secretary of State or the Authority to have regard to an applicant’s suitability in relation to both gas and electricity activities when awarding a licence for new activities under the Gas Act (paragraphs (g) and (h)). The regulations may also confer functions on either the Secretary of State or the Authority in relation to the conduct of the tender (paragraph (i)).

492.Subsection (4) gives the Secretary of State power to make provision for the Secretary of State or the Authority to recover the costs of running the tender and to specify the consequences of any failure to make payment. This could, for example, give the Secretary of State power to require applicants to make payments to cover the costs of running the tender and ending their participation in the tender, and if necessary ending the tender exercise, in the event of any failure to comply. Subsection (6) states that any sums received by the Secretary of State or the Authority will be paid into the Consolidated Fund.

493.The regulations would be subject to the negative resolution procedure.

Part 2: Electricity

Section 56FA New licensable activities: smart meters

494.Section 91 gives the Secretary of State an order-making power to both create new licensable activities under section 56A of the Electricity Act in relation to smart metering and to order that such new licensable activities shall cease to be licensable.

495.Subsection (2) provides that once activities become licensable, it will be an offence under section 4(1) of the Electricity Act to undertake them without a licence.

496.Subsection (3) sets out the scope of the licensing power and it may only be used to make licensable some or all of the activities connected with the provision, installation or operation of smart meters or related infrastructure or services. This could include, for example, the communications infrastructure for smart meters. Subsection (4) provides for the definition of “smart meters” to be set out in the order.

497.Subsection (5) makes provision for the order to include any necessary consequential, transitional, incidental or supplementary changes to primary legislation. This will enable the Secretary of State to add any new licensable activities to the current list of licensable activities in sections 4(1) and 6(1) of the Electricity Act and to make other amendments necessary to ensure that the new licences fit within the existing statutory framework. Such changes could include making a provision similar to section 33(2) of the Utilities Act 2000 to specify how any new standard conditions are to come into effect and/or be suspended; and amending section 33(1) of the Utilities Act so that any modified standard conditions are incorporated as standard conditions for licences of that type.

498.It is envisaged that the existing licensing framework and metering provisions in the Electricity Act will be applied to the new licensable activities including, for example, the procedures for modification of licences in sections 11 to 15 of the Electricity Act and the enforcement powers in sections 25 to 28 of the Electricity Act.

499.Subsection (5)(c) makes provision for the order to specify the standard conditions for any new licensable activities and to modify any existing standard conditions of licences.

500.Subsection (6) sets out a further non-inclusive list of the type of provisions which an order creating new licensable activities could contain. This includes provision restricting the geographic scope of licences which would, for example, facilitate national or regional licensing of smart metering activities (paragraphs (a) and (b)). The order could also confer functions of the Secretary of State or the Authority which would, for example, enable the conferral of the general licensing powers in section 7 of the Electricity Act on the Secretary of State so that he can determine the general licence conditions for any new licences created under these powers.

501.Subsection (7) makes provision for the Secretary of State to specify how long an order will remain in force which could limit the period during which any smart metering activities are licensable.

Section 56FB: section 56FA:supplemental

502.This section sets out the procedure with which the Secretary of State must comply when making an order under section 56FA(1).

503.Subsection (1) obliges the Secretary of State to consult the Authority and others as appropriate before making an order. By virtue of subsection (2), the power to make an order may not be exercised after the end of the period of 5 years beginning with the day on which section 56FA(1) comes into force. Section 56FA(1) comes into force on the passing of the Act (see section 110(1).

504.Subsection (3) provides that the affirmative procedure will apply to the order and it will not come into force unless approved by resolution of each House of Parliament (see also Schedule 5 amending section 106(2)(b) of the Electricity Act).

505.Subsection (4) gives the Secretary of State certain supplemental powers contained in section 60 of the Electricity Act when making any order under section 56FA(1). These include power to make provision for the determination of any questions of fact or law which may arise in giving effect to the order; prescribing time-limits within which things are to be done; and providing for matters under the order to be determined by specified persons and in accordance with specified procedures.

Section 56FC: Competitive tendering for licences for new licensable activities

506.This section gives the Secretary of State power to make regulations providing for the award of licences for new licensable activities by the Secretary of State or the Authority following a competitive tender procedure.

507.Subsection (3) sets out a non-inclusive list of the type of provisions which the regulation may include. The regulations may provide for the licences to be awarded by either the Secretary of State or the Authority (paragraph (a)); and may prescribe the necessary procedures for the tender process including publication of an invitation to tender and the conditions and any restrictions governing the making of applications (paragraphs (b) to (f)).

508.The regulations may also make provision concerning how the applications for licences are to be considered and determined. In particular, the regulations may authorise or require the Secretary of State or the Authority to have regard to an applicant’s suitability in relation to both gas and electricity activities when awarding a licence for new activities under the Gas Act (paragraphs (g) and (h)). The regulations may also confer functions on either the Secretary of State or the Authority in relation to the conduct of the tender (paragraph (i)).

509.Subsection (4) gives the Secretary of State power to make provision for the Secretary of State or the Authority to recover the costs of running the tender and to specify the consequences of any failure to make payment. This could, for example, give the Secretary of State power to require applicants to make payments to cover the costs of running the tender and ending their participation in the tender, and if necessary ending the tender exercise, in the event of any failure to comply. Subsection (6) states that any sums received by the Secretary of State or the Authority will be paid into the Consolidated Fund.

510.The regulations would be subject to the negative resolution procedure.

Gas and Electricity Meters

Summary and Background

511.This element of the Act transfers certain statutory functions relating to gas and electricity meters from the Gas and Electricity Markets Authority (the Authority) to the Secretary of State. These are legal metrology functions: they relate to the legal mechanisms for ensuring the accuracy of meters. The intention is that these functions will in future be performed by the National Weights and Measures Laboratory, an executive agency of the Department for Innovation, Universities and Skills.

512.Administrative responsibility for the technical metering functions and staff was transferred by a Memorandum of Understanding between the Authority and the NWML in 2006. The effect of the sections in this part of the Act is to complete the process of transferring these functions, by putting the existing administrative arrangements on a statutory footing.

513.The Authority regulates the gas and electricity markets in Great Britain. It is currently responsible for, amongst other things, gas and electricity meter approvals, certification (electricity) and stamping (gas) of new meters, the appointment of meter examiners and disputed meter accuracy testing.

514.The National Weights and Measures Laboratory (NWML) has a remit to ensure UK measurement is accurate, fair and legal. Acting on behalf of the Secretary of State, NWML currently has similar responsibilities to those which the Authority has in respect of gas and electricity meters for other measuring instruments, such as weighing machines, fuel pumps and water meters.

515.The Authority recovers the costs of performing its metrological functions through a licensing fee charged to network operators. The costs of performing these functions accounts for only a small part (under 2%) of the costs recovered in this way. It is proposed that when the Act transfers these functions to the Secretary of State, the costs incurred by the NWML in performing these functions should continue to be recovered as part of the licensing fee paid by network operators. An amendment to the relevant network operators’ licence conditions is therefore required in order to allow the Authority to pass the recovered funds to the NWML.

516.On completion of the transfer, the NWML will have responsibility for the standards and accuracy of gas and electricity meters. However, the Authority will retain its current responsibilities for smart and pre-payment metering policy will remain with the Authority, since they relate to the regulation and strategy for where, when and how these types of meter are used. The NWML will cover whether these types of meter measure accurately.

Commentary on Sections

Section 92: Gas meters

517.Section 17 of the Gas Act 1986 (c. 44) sets out existing requirements on the use of gas meters and specifies that no meter shall be used for ascertaining the quantity of gas supplied unless it has been stamped by an appointed meter examiner. It further sets out the requirements and responsibilities of those meter examiners when examining and stamping meters, and provides for their remuneration. Section 17 also allows for regulations to be made by the Authority which relate to, amongst other things:

  • the prescribed standards meters must satisfy to be stamped, which include the performance requirements and routes to demonstrating conformity;

  • how and why meter approvals are revoked and the process that has to be followed if, for example, a design defect is found when meters are used in service; and

  • what happens when meter accuracy is disputed, including the circumstances when meters can be re-examined, the standards the meter should meet and the actions of the meter examiner following the re-examination.

518.Subsection (1) transfers to the Secretary of State the Authority’s functions under section 17 of the Gas Act 1986 (c. 44) and certain regulations relating to gas meters made under that section or under section 2(2) of the European Communities Act 1972 (“gas meter regulations”, as defined in subsection (5)). Subsection (2) ensures that references to the Authority, in section 17 of the 1986 Act or in gas meter regulations, will be read as references to the Secretary of State.

519.Subsections (3) and (4) will ensure that existing regulations made under section 17 of the 1986 Act, and other regulatory actions of the Authority in relation to meters, have effect as if made or done by the Secretary of State.

520.The combination of the changes set out insubsections (1) to (4) transfers the responsibility for the functions (including the power to make regulations) under section 17 to the Secretary of State. This formally transfers these responsibilities from the Authority to the NWML.

Section 93: Section 92: consequential amendments

521.This section makes amendments to section 17 of the Gas Act 1986 (c.44) which are consequential on the transfer of functions from the Authority to the Secretary of State and relate to meter examiners.

522.Meter examiners are currently appointed by the Authority (in future, by the Secretary of State) under section 17. Examiners carry out much of the technical work done under that section and gas meter regulations. At present, most meter examiners are not civil servants.

523.By inserting a new subsection (7A) into section 17, subsection (4) makes provision for the Secretary of State to contribute towards the remuneration and pensions of non-civil service meter examiners and the maintenance of the equipment they use to perform their statutory functions. The new subsection provides clarity about payments to non-civil servant meter examiners (and, in some cases, their employers) in respect of the carrying out of statutory functions.

Section 94 and Schedule 5: Power to amend licence conditions: gas

524.In transferring these legal metrology functions, it is necessary to ensure that the NWML can recover the costs of carrying out the transferred functions. To make this possible, licence payment conditions need to be modified to allow the Authority to recover funds from the licence fee and pass them to the NWML.

525.This section therefore gives the Secretary of State the power to modify gas transporter licence conditions under sections 7 and 8 of the Gas Act 1986 (c.44). Section 7 covers the requirements for licensing gas transporters, whilst section 8 covers standard conditions of such licences.

526.The effect of the section is that, following licence modifications made by the Secretary of State, the Authority will be able to recover from gas transporters costs incurred by the NWML in respect of functions in relation to gas meters, and pay those costs into the Consolidated Fund.

527.There are a number of checks and balances built into the section by virtue of subsections (4) to (9). They require the Secretary of State to consult licence holders, the Authority and any other persons as appropriate before making licence modifications. The Secretary of State must also publish the modifications, and ensure that the modifications made apply to all future licences.

528.Subsection (9) has the effect that modifications can only be made to licence conditions by the Secretary of State for six months after subsection (1) comes into force. The deadline is to provide certainty to the gas transporters that the power will only be used once for the purpose of allowing the Authority to recover funds and pass them onto NWML. Given the technical nature, it is not considered appropriate to detail the licence modification on the face of the Act.

529.Paragraph 14 of Schedule 5 makes amendments to the Utilities Act 2000 (c.27) which are consequential on the transfer of functions from the Authority to the Secretary of State.

Section 95: Electricity meters

530.Schedule 7 to the Electricity Act 1989 (c.29) describes, amongst other things, how electricity meters must be examined and certified. The Schedule further sets out requirements in relation to electricity meter examiners. The Schedule allows the Authority to make regulations which relate to, for example:

  • the requirements new meter designs must meet to be approved, which include the performance and routes to demonstrating conformity;

  • the requirements on manufacturers or repairers when submitting meters for certification which include meter performance, testing equipment and reporting; and

  • audit arrangements for manufacturers and repairers when seeking authorisation to self certify meters.

531.Subsection (1) transfers to the Secretary of State the Authority’s functions under Schedule 7 (other than paragraph 12) to the Electricity Act 1989 (c.29) and certain regulations relating to electricity meters made under that Schedule or under section 2(2) of the European Communities Act 1972 (“electricity meter regulations”, as defined in subsection (5)). Subsection (2) ensures that references to the Authority in Schedule 7 to the Electricity Act will be read as references to the Secretary of State. The omission of paragraph 12 to Schedule 7 from the transfer means that the Authority will continue to have responsibility for policy decisions about how and when pre-payment meters should be used.

532.Subsections (3) and (4) will ensure that existing regulations made at any time under Schedule 7 to the Electricity Act, and other regulatory actions of the Authority in relation to meters, have effect as if made or done by the Secretary of State.

Section 96: Section 95: consequential amendments

533.This section makes amendments to Schedule 7 to the Electricity Act 1989 (c.29) which are consequential on the transfer of functions from the Authority to the Secretary of State.

534.Meter examiners are appointed by the Authority (in future, by the Secretary of State) under Schedule 7. Examiners carry out much of the technical work done under that Schedule and electricity meter regulations. At present, most meter examiners are not civil servants.

535.By inserting a new paragraph 4(2A) into Schedule 7, subsection (4)(b) makes provision for the Secretary of State to contribute towards the remuneration and pensions of non-civil service meter examiners and the maintenance of the equipment they use to perform their statutory functions. The new paragraph is to provide clarity about payments to non-civil servant meter examiners (and, in some cases, their employers) in respect of the carrying out of statutory functions.

536.Paragraph 12 of Schedule 7 allows the Authority to make regulations which permit sums owed to be recovered from customers using a pre-payment meter. This power will remain with the Authority. As such, policy decisions on how and when pre-payment meters should be used will continue to rest with the Authority, although the NWML will be responsible for the accuracy of pre-payment meters.

Section 97 and Schedule 5 : Power to amend licence conditions: electricity

537.In transferring these legal metrology functions, it is necessary to ensure that the NWML can recover the costs of carrying out these transferred functions. To make this possible, licence payment conditions therefore need to be modified to allow the Authority to recover funds from the licence fee and pass them through the Consolidated Fund to the NWML.

538.This section therefore allows the Secretary of State to modify electricity transmission and distribution licence conditions under section 6(1)(b) or (c) and section 8A of the Electricity Act 1989 (c.29). Section 6(1)(b) covers the requirements for licensing electricity transmitters and section 6(1)(c) covers the requirements for licensing electricity distributors, whilst section 8A covers standard conditions of such licences.

539.It has the effect that following licence modifications, the Authority will be able to recover from electricity transmission and distribution operators costs incurred by the NWML in respect of functions in relation to electricity meters, and pay those costs into the Consolidated Fund.

540.There are a number of checks and balances built into the section by virtue of subsections (4) to (9). They require the Secretary of State to consult licence holders, the Authority and any other persons as appropriate before making licence modifications, which must be published, and ensure those modifications apply to all future licences.

541.Subsection (9) has the effect that modifications can only be made to licence conditions by the Secretary of State for 6 months after subsection (1) comes into force. The deadline is to provide certainty to the gas transporters that the power will only be used once for the purpose of allowing the Authority to recover funds and pass them onto NWML. Given the technical nature of the licence modification, it is not considered appropriate to set it out on the face of the Act.

542.Paragraph 13 of Schedule 5 makes amendments to the Utilities Act 2000 (c.27) which are consequential on the transfer of functions from the Authority to the Secretary of State.

Connection Offer Expenses

Summary and Background

543.New developments such as retail parks or housing projects require connections to the local electricity distribution network. When assessing the capital costs of such developments, developers need to know how much such a connection would cost and can request a network connection offer from the relevant Distribution Network Operator. The Distribution Network Operator is required, under the Electricity Act 1989, to provide a network connection offer following such a request. When providing the connection offer, the Distribution Network Operator will incur costs, for example, in determining the most appropriate point of connection to its network, designing the connection to the network and assessing what upstream changes need to be made to provide the load requested.

544.Until 2008, the practice was that Distribution Network Operators charged persons making connection requests up front for the costs incurred when providing network connection offers(7). However, following a complaint lodged with the Authority about this practice, legal advice confirmed that the Electricity Act 1989 only permitted Distribution Network Operators to recover these costs if an actual connection to the network was made. Since this issue came to light, the Authority has required Distribution Network Operators to change their charging methodologies to remove all elements of up front charging and bring them in line with the statutory arrangements. However, this means that because there are instances where connection offers are made but no connection is established, the Distribution Network Operators are unable to recoup all of their costs. Examples of such scenarios are, where developers make speculative requests about developments that do not then go forward, or where a third party connections provider requests an offer on a speculative basis. It is envisaged that without the ability to charge up front, that Distribution Network Operators may pass their assessment and design costs onto all users of the network, rather than those who cause these costs to be incurred.

545.This section will amend the Electricity Act 1989 to allow for up front charging in certain circumstances to allow Distribution Network Operators to recoup the costs of providing network connection offers.

Commentary on Sections

Section 98: Costs connected with making an offer of connection

546.Section 16 of the Electricity Act 1989 states that a Distribution Network Operator is under a duty to make connections to the distribution system in specified circumstances. Section 16A of the Electricity Act 1989 states that when a third party requests a connection from an electricity distributor, the distributor is required to provide a network connection offer. Section 19 of the Electricity Act 1989 enables the electricity distributor to recover costs reasonably incurred in providing a network connection. The provision does not, however, entitle Distribution Network Operators to charge for work carried out, and expenses incurred, for network connection offers where a connection is not subsequently made.

547.Subsection (2) of section 98 addresses this problem by inserting new subsections (4A) to (4C) into section 16A of the Electricity Act 1989.

548.Subsection (4A) of the Electricity Act 1989 provides the Secretary of State with a power to make regulations entitling a Distribution Network Operator to request (to such extent as is reasonable in the circumstances) payment of expenses incurred when making network connection offers under section 16A(5) of the Electricity Act 1989. The power may only be exercised after consultation with the Authority.

549.Subsection (4B) states that the kind of expenses recoverable will be specified in regulations and, consistent with section 19(1) of the Electricity Act 1989, must have been reasonably incurred. The combined effect of subsections (4A) and (4B) is that a Distribution Network Operator may only request payment of his expenses if it is reasonable to do so.

550.Subsection (4C) provides scope for the regulations to specify circumstances under which an electricity distributor is not entitled to require payment and how expenses reasonably incurred are to be calculated.

Electricity Safety

Summary and Background

551.This element of the Act relates to electricity safety standards, which are aimed at protecting the general public and consumers from danger. The purpose is to allow for stronger sanctions where there is a breach of electricity safety standards and also to complete the implementation of a recommendation made by Philip Hampton in his March 2005 report, Reducing Administrative Burdens: Effective Inspection and Enforcement.

552.In October 2006, following the Hampton report, there was an administrative transfer of the responsibility for electricity safety standards, from the Secretary of State to the Health and Safety Executive (HSE) which provided for the HSE to exercise functions on the Secretary of State’s behalf. Electricity safety standards are set out in the Electricity Safety, Quality and Continuity Regulations 2002 (S.I. 2002/2665) (as amended) (made under the Electricity Act 1989 (c.29)), and include such things as the correct minimum height of overhead lines, appropriate controls on the use of underground cables, and earthing of metalwork.

553.This element of the Act formalises the administrative transfer and creates a consistent approach to the enforcement of safety regulation by giving overall responsibility to one regulatory body. This is in line with the wider Hampton recommendation for HSE to become the overall regulator for safety matters, to reduce the administrative burden of more than one regulator having similar functions.

554.The changes also allow HSE inspectors to use the sanctions available to them under the Health and Safety at Work etc. Act 1974, when enforcing electricity safety standards. These sanctions are considered by the government to better reflect the seriousness of a breach of electricity safety standards and are the same as sanctions available for a breach of other safety legislation enforced by the HSE.

555.The Electricity Safety, Quality and Continuity Regulations 2002 deal with issues of both electricity safety and security of supply. This element of the Act deals only with electricity safety. Responsibility for regulating security of supply will remain with the Secretary of State.

Commentary on Sections

Section 99: Electricity Safety

556.Section 29 of the Electricity Act 1989 allows the Secretary of State to make regulations relating to electricity safety and supply. The regulations relating to electricity safety and security of electricity supply that are made under section 29, are the Electricity Safety, Quality and Continuity Regulations 2002 (as amended). Part 1 of the Health and Safety at Work etc. Act 1974 sets out provisions for the purpose of enabling the Health and Safety Executive (HSE) to secure the health, safety and welfare of persons.

557.This section makes section 29 of the Electricity Act 1989 (c.29), and regulations made under it, existing statutory provisions under Part 1 of the Health and Safety at Work etc. Act 1974 (c.37), so far as they relate to safety. This has the effect that section 29 and any associated Regulations will be considered as always having existed as statutory provisions of the Health and Safety at Work etc. Act 1974.

558.The effect of this section is to pass responsibility for electricity safety standards, including the inspection and enforcement of them, from the Secretary of State to the HSE. This therefore gives the HSE the power to amend those electricity safety standards should it see fit.

559.By making section 29 an existing statutory provision, HSE inspectors will be able to use existing statutory powers, available under the Health and Safety at Work etc. Act 1974 (c. 37), to prosecute for a breach of electricity safety standards. This provides an alternative, stronger sanction than any of those available under the Electricity Safety, Quality and Continuity Regulations 2002.

560.The sanctions available under the regulations are, on summary conviction, a fine not exceeding level 5 on the standard scale for each breach (currently £5,000 in England, Wales and Northern Ireland and £10,000 in Scotland). Once section 29 is made an existing statutory provision, the maximum sanction would be a £20,000 fine, on summary conviction, or an unlimited fine, on conviction on indictment. This is in line with existing health and safety penalties.

561.The Health and Safety at Work etc. Act 1974 also allows for prosecution for non-compliance where an Improvement Notice under section 21 or a Prohibition Notice under section 22 has been issued. Where there has been non-compliance with an enforcement notice, inspectors could prosecute on indictment with an unlimited fine or 2 years imprisonment, or both.

562.Section 15 of the Health and Safety at Work etc. Act 1974 gives the Secretary of State the power to make health and safety regulations. Subsection (2) of this section sets out that regulations made under section 15 of the Health and Safety at Work etc. Act 1974 can remove or amend section 29 of the Electricity Act 1989, or any regulations made under it, or make new regulations that could have been made under section 29.

7

The practice of levying upfront charges was reflected in each DNOs’ Connection Charging Methodology that are approved by the Authority. Back [7]