Work No. 8Q—Realignment of Kent Avenue, including a bridge over a private siding, the Tilbury Loop Railway and the railways (Works Nos. 8, 8E, 8G and 8J), commencing in that road at a point 205 metres south of its junction with New Road, Hornchurch, passing southwards over the said railways and terminating in Kent Avenue at a point 10 metres north of the northern end of the viaduct carrying that road over Dagenham Breach;

Work No. 8R—Realignment of Thames Avenue, including a bridge over the Tilbury Loop Railway, the railways (Works Nos. 8, 8G and 8J) and private sidings, commencing in that road at a point 25 metres south of its junction with New Road, Hornchurch, passing southwards over those railways and terminating in Thames Avenue at the junction of Lake Road with that road;

Work No. 8S—A road commencing by a junction with Bridge Road at the roundabout on that road 200 metres south of its junction with New Road, Hornchurch, passing westwards over Rainham Creek, then south-westwards under the Tilbury Loop Railway and the railway (Work No. 8), then passing southwards over Rainham Creek at a point 140 metres downstream from the bridge carrying the Tilbury Loop Railway over that river, then south-eastwards and terminating by a junction with Ferry Lane at the southernmost junction of Lamson Road with that road;

Work No. 8T—A road, forming an access to the Riverside Sewage Treatment works at Rainham off the new road (Work No. 8S), commencing in the said Treatment Works at Creekside Cottages, passing south-eastwards and eastwards and terminating by a junction with Work No. 8S at a point 70 metres south-west of the intended viaduct carrying the railway (Work No. 8) over that new road;

Work No. 8U(4)—A cut, forming a diversion of the Ship and Shovel Relief Channel, commencing by a junction with that watercourse at a point 148 metres from its confluence with The Gores, passing eastwards, then south-eastwards and terminating in The Gores at that confluence;

Work No. 8U(13)—A cut, forming a diversion of The Gores, commencing at the confluence of the Ship and Shovel Relief Channel (Work No. 8U(4)) with that stream, passing eastwards then northwards under the railways (Works Nos. 22, 22A, 22B, 22E, 22F and 22G), and terminating by a junction with The Gores at a point 70 metres east of the northern end of its existing culvert under the Tilbury Loop Railway;

Work No. 8U(6)—A cut, forming a diversion of Pooles Sewer, commencing by a junction with that watercourse 85 metres south of the southern side of the existing Manor Way level crossing on the Tilbury Loop Railway, passing eastwards and south-eastwards, then northwards under the railway (Work No. 8) and terminating by a junction with that watercourse at the southern end of its culvert under the Tilbury Loop Railway;

Work No. 8U(7)—A cut, forming a diversion of the Ferry Lane Sewer, commencing by a junction with that watercourse at the northern end of its culvert under the Tilbury Loop Railway west of Rainham Station, passing southwards under that railway and the railway (Work No. 8), then eastwards and southwards and terminating in that watercourse on the western side of Ferry Lane at a point 48 metres south of the existing Ferry Lane level crossing on the Tilbury Loop Railway;

Work No. 8U(8)—A cut, forming a diversion of the Rainham Cross Sewer, commencing at a point on the southern side of the Tilbury Loop Railway 375 metres east of the eastern end of Rainham Station, passing eastwards for a distance of 95 metres and there terminating by a junction with that watercourse;

Work No. 8U(9)—A cut, forming an improvement of the Rainham Main Sewer, commencing in that watercourse at a point 15 metres north of the northern end of its existing culvert under the Tilbury Loop Railway, passing under that railway and the railway (Work No. 8) and terminating in that watercourse at a point 52 metres south of the southern end of that existing culvert;

Work No. 8U(10)—A cut, forming a diversion of the Wennington Main Sewer, commencing by a junction with the cut (Work No. 8U(9)) at a point 10 metres north of its termination, passing south-eastwards on the southern side of the existing watercourse and terminating by a junction with that watercourse at a point 100 metres south of the southern end of a branch of that watercourse south of Manstead Gardens;

Work No. 8U(11)—A cut, forming an improvement of the Common Watercourse (Southall Sewers), commencing in that watercourse at a point 10 metres north-east of the northern end of its existing culvert under the Tilbury Loop Railway, passing south-westwards under that railway and the railway (Work No. 8) and terminating in that watercourse at a point 47 metres south-west of the southern end of that existing culvert;

Work No. 8U(12)—A cut, forming a diversion of Wennington Branch Sewer, commencing in that watercourse at a point 10 metres north-east of the northern end of its existing culvert under the Tilbury Loop Railway, passing under that railway and the railway (Work No. 8) and terminating in that watercourse at a point 40 metres south-west of the southern end of that existing culvert;

In the London Borough of Havering and in the borough of Thurrock, in the county of Essex—

Wennington to Purfleet

Work No. 23—A railway (3,835 metres in length) commencing by a junction with the railway (Work No. 8) at its termination, passing south-eastwards on the southern side of the realigned Tilbury Loop Railway (Work No. 23A) then on viaduct over that railway, then over the diverted Aveley Sewer (Work No. 23D) and under the new road (Work No. 23B(1)), then continuing over Mar Dyke and under the new road (Work No. 23C(2)), passing on the southern side of the Purfleet Bypass and terminating at a point 250 metres east of the junction of London Road, Purfleet with the Purfleet Bypass, including the said viaduct and a bridge over Mar Dyke;

Work No. 23A—A railway (1,185 metres in length), being a realignment of the Tilbury Loop Railway, commencing by a junction with that railway at a point 230 metres south-east of the Wennington Branch Sewer where that sewer passes in culvert under that railway, passing south-eastwards in tunnel under the railway (Work No. 23) and terminating by a junction with the Tilbury Loop Railway at a point 240 metres south-west of the point where Tank Hill Road is crossed on the level by the Tilbury Loop Railway;

In the borough of Thurrock, in the county of Essex—

Work No. 23B(1)—A road, forming a diversion of Tank Hill Road (A1090), commencing by a junction with Arterial Road, Purfleet (A13) at a point 165 metres north of its junction with Tank Hill Road, passing south-westwards then southwards over the diverted Aveley Sewer (Work No. 23D), the railway (Work No. 23), the Tilbury Loop Railway and Mar Dyke and terminating in that road at a point 15 metres north of the junction of Marlow Avenue with Tank Hill Road, including bridges over Works Nos. 23 and 23D, the Tilbury Loop Railway and Mar Dyke;

Work No. 23B(2)—A road, forming an access road into the Purfleet Industrial Estate, commencing by a junction with the new road (Work No. 23B(1)) at a point 130 metres west of the junction of Tank Hill Road with Arterial Road, Purfleet (A13), passing westwards then northwards and terminating at a point in the said estate 155 metres north-west of its commencement;

Work No. 23B(3)—A road, forming an access road, commencing by a junction with the new road (Work No. 23B(1)) at a point 110 metres south-west of the point where Tank Hill Road is crossed on the level by the Tilbury Loop Railway, passing eastwards and terminating at a point 105 metres south of that level crossing;

Work No. 23C—Diversion of Arterial Road, Purfleet, and Purfleet Bypass and diversion of Tank Lane and Botany Way, comprising—

Work No. 23C(1)—Diversion of the A13 (Arterial Road, Purfleet) commencing in that road at a point 360 metres west of its existing junction with Purfleet Bypass, passing eastwards by way of the northern junction roundabout forming part of Work No. 23C(2), and terminating in the A13 at a point 235 metres east of the said existing road junction;

Work No. 23C(2)—A road, including junction roundabouts at its commencement and termination, commencing by a junction with the diverted Arterial Road, Purfleet (Work No. 23C(1)) at a point 48 metres north-east of the existing junction of Arterial Road with Purfleet Bypass, passing south-westwards over the railway (Work No. 23) and terminating by a junction with the diverted Tank Lane (Works Nos. 23C(4) and 23C(5)) at a point 150 metres west of the existing junction of Tank Lane with Botany Way, including a bridge over Work No. 23;

Work No. 23C(3)—Diversion of Purfleet Bypass at its junction with the A13 commencing by a junction with that road at the northern junction roundabout forming part of Work No. 23C(2), passing southwards and south-eastwards and terminating in Purfleet Bypass at a point 160 metres north-west of its junction with North Road;

Work No. 23C(4)—Diversion of Tank Lane commencing at a point 165 metres north of the bridge carrying Tank Lane over the Tilbury Loop Railway, passing southwards then eastwards along the northern side of Tank Lane, then south-eastwards along the line of that road and terminating at the southern junction roundabout forming part of Work No. 23C(2), at a point 150 metres west of the existing junction of Tank Lane with Botany Way;

Work No. 23C(5)—Diversion of Tank Lane and Botany Way, commencing at the southern junction roundabout forming part of Work No. 23C(2) at a point 150 metres north-west of its existing junction with Botany Way, passing eastwards then southwards on the line of Botany Way and terminating by a junction with that road at a point 115 metres south-west of its existing junction with Purfleet Bypass;

Work No. 23D—A cut, forming a diversion of the Aveley Sewer, commencing in that watercourse at a point 25 metres south-west of the southern end of its existing culvert under the Tilbury Loop Railway, passing in a north-easterly direction under the railways (Works Nos. 23 and 23A) and the new road (Work No. 23B(1)), then passing northwards and terminating at a point in a new balancing pond 95 metres north-west of the junction of Tank Hill Road with Arterial Road, Purfleet;

Purfleet to West Thurrock

Work No. 9—A railway (1,537 metres in length) commencing by a junction with the railway (Work No. 23) at its termination, passing south-eastwards on viaduct over the A1090 (London Road, Purfleet), the Tilbury Loop Railway and the northbound Dartford Tunnel Approach Road (Canterbury Way), under a span of the southbound approach to the Queen Elizabeth II Bridge, and over Oliver Close (North) (Work No. 9B) in the West Thurrock Industrial Estate to a point 90 metres west of the existing southernmost junction of Oliver Close with Oliver Road, then under Oliver Road (Work No. 9C) and terminating at a point 160 metres south-east of that existing road junction, including the said viaducts and a bridge over Work No. 9A(1);

Work No. 9B—Diversion of Oliver Close (North) commencing in that road at a point 25 metres south of the westernmost corner of that road, passing northwards for a distance of 60 metres from that commencement under the railway (Work No. 9), then turning eastwards and terminating by a junction with Oliver Close (North) at a point 160 metres west of its junction with Oliver Road;

Work No. 9C—Diversion of Oliver Road, including a bridge over the railway (Work No. 9), commencing in that road at the existing junction of that road with Oliver Close (North), passing southwards over Work No. 9 on the eastern side of the existing road, and terminating by a junction with Oliver Road at a point 130 metres south of its existing junction with Burnley Road;

Work No. 9D—Realignment of Burnley Road and Watson Close commencing by a junction with Oliver Road (Work No. 9C) at the existing road junction, passing eastwards along the line of, and then to the south of, Burnley Road, then turning northwards and terminating in Watson Close at a point 60 metres north of its existing junction with Burnley Road;

Work No 9F(1)—A railway (835 metres in length) commencing by a junction with the railway (Work No. 9F(2)) at a point 275 metres from its commencement, passing westwards, south-westwards, southwards and south-eastwards and terminating at a point on the western side of Watson Close (Work No. 9D) at a point 45 metres north of the existing junction of that road with Burnley Road;

Work No. 9F(2)—A deviation railway (849 metres in length), commencing by a junction with the Tilbury Loop Railway at a point 325 metres east of the bridge carrying the southbound approach to the Queen Elizabeth II Bridge over that railway, passing eastwards on the southern side of that railway and terminating at the eastern end of the existing sidings;

In the borough of Thurrock, in the county of Essex, and in the borough of Dartford, parishes of Swanscombe and Greenhithe, Southfleet and Longfield and New Barn, in the borough of Gravesham, town of Gravesend, and in the district of Sevenoaks, parish of Horton Kirby and South Darenth, in the county of Kent—

West Thurrock and Ebbsfleet to Singlewell

Work No. 10—A railway (9,161 metres in length) commencing by a junction with the railway (Work No. 9) at its termination, passing south-eastwards to a point 249 metres from that commencement, then passing in tunnel beneath Burnley Road and Watson Close (Work No. 9D), then beneath the River Thames and Bell Wharf, Swanscombe, with shafts at Burnley Road, West Thurrock Power Station, Bell Wharf and Swanscombe Marsh, continuing in tunnel south-eastwards to a point 120 metres north-west of the existing junction of Green Manor Way with Lower Road, then passing south-eastwards and southwards, under Galley Hill Road (Work No. 10K), then in tunnel for a distance of 58 metres beneath the North Kent Railway, continuing under the railway (Work No. 10C) and the new road (Work No. 10S(1)), then on viaduct over the River Ebbsfleet, then in tunnel for a distance of 310 metres beneath the course of the former Gravesend West Branch Railway and the A2 (Watling Street) at a point 50 metres west of the southern abutment of the bridge carrying the B262 (Hall Road) over that road, then passing in tunnel for distances of 35 metres and 25 metres respectively beneath the B262 and the slip road to that road and Station Road on the southern side of the A2, then continuing south-eastwards on the southern side of the A2, then in tunnel for a distance of 80 metres beneath the railway (Work No. 11A) and on viaduct over the A227 (Wrotham Road) and terminating at a point 180 metres east of that road 340 metres south of the southern side of the bridge carrying the A2 over that road, including the said viaducts over the River Ebbsfleet and Wrotham Road;

Work No. 10A—A railway (1,732 metres in length), partly for construction purposes, commencing at the seaward end of the existing Swanscombe Jetty, passing south-eastwards from that jetty and terminating by a junction with the railway (Work No. 10B) at a point 40 metres south-east of the intended bridge (Work No. 10K) carrying Galley Hill Road over that railway;

Work No. 10B—A railway (2,281 metres in length) commencing by a junction with the railway (Work No. 10) at a point 113 metres north-west of the intended bridge (Work No. 10K) carrying Galley Hill Road over that railway, passing south-eastwards on the eastern side of that railway under that road, and in tunnel for a distance of 71 metres beneath the North Kent Railway, then passing eastwards over a private road between the Northfleet Cement Works and Springhead Road, then in tunnel for a distance of 60 metres beneath the North Kent Railway at a point 30 metres south-east of the eastern abutment of the bridge carrying that railway over the mineral railway at the entrance to Church Path Pit, then south-eastwards on the northern side of the North Kent Railway, under Springhead Road (Work No. 10N) and terminating by a junction with that railway at a point 110 metres east of the intended bridge forming part of Work No. 10N, including a bridge over the said private road;

Work No. 10C—A railway (2,324 metres in length) commencing by a junction with the railway (Work No. 10) at a point 140 metres north-west of the intended bridge (Work No. 10K) carrying Galley Hill Road over that railway, passing south-eastwards on the western side of that railway under that road and in tunnel for a distance of 54 metres beneath the North Kent Railway, then eastwards, over the railways (Works Nos. 10, 10D and 10E) and over the said private road between the Northfleet Cement Works and Springhead Road, then south-eastwards on viaduct across the northern bay of the Blue Lake south of the North Kent Railway and under Springhead Road (Work No. 10N) and terminating by a junction with that railway at a point 95 metres east of the intended bridge forming part of Work No. 10N, including the said viaduct and bridges over Works Nos. 10, 10D and 10E and the said private road;

Work No. 10D—A railway (1,523 metres in length) commencing by a junction with the railway (Work No. 10B) at a point 45 metres north-west of the northern portal of the intended tunnel by which that railway passes beneath the North Kent Railway, passing south-eastwards on the western side of Work No. 10B beneath the North Kent Railway in that tunnel, then continuing southwards on the eastern side of the railway (Work No. 10), under the railway (Work No. 10C) and the new road (Work No. 10S(1)) and terminating by a junction with Work No. 10 at a point 10 metres south of the commencement of the intended viaduct carrying that railway over the River Ebbsfleet;

Work No. 10E—A railway (1,445 metres in length) commencing by a junction with the railway (Work No. 10C) 7 metres north-west of the southern portal of the intended tunnel by which that railway passes beneath the North Kent Railway, passing south-eastwards on the eastern side of Work No. 10C, then under that railway and continuing on the western side of the railway (Work No. 10), under the new road (Work No. 10S(1)) and terminating by a junction with Work No. 10 at a point 5 metres north of the commencement of the said intended viaduct carrying that railway over the River Ebbsfleet;

Work No. 10F—A railway (532 metres in length) commencing by a junction with the railway (Work No. 10B) at a point 140 metres west of the bridge carrying the North Kent Railway over the mineral railway at the entrance to the Church Path Pit, passing eastwards under that bridge and terminating in that pit at a point 378 metres east of that railway bridge;

Work No. 10F(1)—A railway (200 metres in length) commencing by a junction with the North Kent Railway at a point 230 metres north-west of the western end of the westbound platform of Northfleet Station passing eastwards and terminating by a junction with the sidings of the mineral railway on the southern side of the North Kent Railway at the western end of those sidings;

Work No. 10G—Improvement of Manor Way (West) commencing at the junction of that road with the A226 (London Road), passing north-eastwards and eastwards along the line of Manor Way (West) and terminating at a point 20 metres east of the junction of that road with Pilgrims Road;

Work No. 10H—A road commencing by a junction with Manor Way (West) (Work No. 10G) at the termination of that work, passing eastwards, then south-eastwards and terminating at the existing roundabout at the west end of the central access road in the Northfleet Industrial Estate;

Work No. 10J—A road, forming a diversion of Lower Road and Green Manor Way, commencing by a junction with Manor Way (West) (Work No. 10G) at its termination, passing northwards on the line of the footpath DS2 to a point 280 metres north of its existing junction with Lower Road, then turning eastwards and south-eastwards on the eastern side of the railway (Work No. 10) to a point on the northern side of Lower Road 330 metres east of its existing junction with Green Manor Way, then passing north-eastwards and eastwards on the line of Lower Road and terminating by a junction with Lower Road at a point 60 metres north of its junction with Stonebridge Road and Galley Hill Road;

Work No. 10J(1)—A road commencing by a junction with Green Manor Way at a point 310 metres north of its existing junction with Lower Road, passing southwards then south-westwards and terminating by a junction with the new road (Work No. 10J) at a point 85 metres from that commencement;

Work No. 10J(2)—A road commencing by a junction with Manor Way (East) at a point 110 metres north of its existing junction with Lower Road, passing southwards and terminating by a junction with the new road (Work No. 10J) at a point 105 metres from that commencement;

Work No. 10K—Realignment of Galley Hill Road, including a bridge over the railways (Works Nos. 10, 10A, 10B and 10C), commencing in that road at a point 270 metres east of its junction with London Road, Swanscombe, and terminating in Galley Hill Road at a point 310 metres west of its junction with Stonebridge Road;

Work No. 10N—Realignment of Springhead Road, including a bridge over the railways (Works Nos. 10B and 10C) and the North Kent Railway, commencing in that road at a point 40 metres north of the northern abutment of the existing bridge carrying that road over the North Kent Railway and terminating in that road at a point 110 metres south of the southern abutment of that existing bridge;

Work No. 10P—Diversion of Downs Road commencing in that road at a point 310 metres south-east of its junction with the Hog Lane subway under the A2 (Watling Street), passing south-eastwards and eastwards then southwards over the railways (Works Nos. 10, 11A and 11B) and terminating in Downs Road at a point 330 metres south of the existing junction with that road of the road to Northfleet Green, including bridges over Works Nos. 10, 11A and 11B;

Work No. 10Q—Diversion of the road from Downs Road to Northfleet Green commencing in that road at a point 20 metres east of the access from that road to Hazells, passing south-eastwards and terminating by a junction with Downs Road (Work No. 10P) at a point 210 metres north of the termination of that work;

Work No. 10R—A road, for construction purposes, including a bridge over the A2, commencing in the course of the former Gravesend West Branch Railway at a point 35 metres north-east of the northern side of that road, passing south-westwards over that road and terminating in the disused railway at a point 50 metres south-west of the southern side of that road;

Work No. 10R(1)—A cut, forming a diversion of the Swanscombe Main Drain south of the sewage disposal works on Swanscombe Marshes, commencing in that drain at a point 60 metres north of the junction of Pilgrims Road with Manor Way (West), passing northwards, then in culvert north-westwards under the new road (Work No. 10J), then northwards and terminating in that drain at the south-western corner of the said sewage works;

Work No. 10R(2)—A drainage pumping main commencing at a point 300 metres south-west of the western end of the platform of Northfleet Station, passing north-eastwards, under the railway (Work No. 10F(1)) and the North Kent Railway, then continuing north-eastwards and eastwards in Stonebridge Road and Grove Road between its junctions with Stonebridge Road and College Road, then eastwards in the Creek to a point 40 metres east of the junction of that road with College Road, then passing north-eastwards and terminating at a point at low water on the south bank of the River Thames 15 metres east of Robins Creek;

Work No. 10S(1)—A road commencing by a junction with the access road between the Northfleet Cement Works and Springhead Road at a point 75 metres south of the southern end of the bridge carrying that road over the River Ebbsfleet, passing southwards over that river, over the railways (Works Nos. 10, 10D and 10E), then south-westwards and terminating by a junction with the new road (Work No. 10S(2)) at a point 140 metres north of the junction with the existing Southfleet Road of the access road to the Northfleet West Grid Substation, including roundabouts at that commencement and termination and bridges over the river and Works Nos. 10, 10D and 10E;

Work No. 10S(2)—A road commencing at a point adjoining Southfleet Road 310 metres north of the existing junction with that road of the said road access to the Northfleet West Grid Substation, passing southwards to a point 120 metres south of that existing road junction then passing south-eastwards and terminating at a point 60 metres east of Southfleet Road, 220 metres north of the existing junction with the A2 of the road access from that road to the Northfleet West Grid Substation, including a roundabout at that termination;

Work No. 10T(1)—A road commencing by a junction with the new road (Work No. 10S(2)) at its termination, passing eastwards, then south-eastwards to a junction with Work No. 10T(4) at its termination, then eastwards over the railway (Work No. 10) in tunnel and terminating in the existing eastbound exit slip road of the A2 at Pepper Hill at a point 80 metres north-west of the junction of that slip road with Hall Road;

Work No. 10T(3)—A road commencing by a junction with the road (Work No. 10T(1)) at a point 85 metres north-west of the access to the Springhead Nursery from the existing access road on the northern side of the A2, passing south-eastwards on the southern side of Work No. 10T(1), over the railway (Work No. 10) in tunnel, and terminating in the eastbound carriageway of the A2 at a point 250 metres south-east of the bridge carrying Hall Road over the A2;

Work No. 10T(4)—A road, forming an exit slip road from the eastbound carriageway of the A2, commencing in that carriageway at a point 325 metres east of the footbridge over the A2 between Blue House and Swanscombe Park, passing eastwards over the new roads (Works Nos. 10T(6) and 10T(8)) and terminating by a junction with the road (Work No. 10T(1)) at a point 260 metres from its commencement;

Work No. 10T(6)—A road, forming an entry slip road to the westbound carriageway of the A2, commencing by a junction with the new road (Work No. 10S(2)) at its termination, passing southwards under the A2 then south-westwards, westwards and north-westwards to a point 300 metres west of the bridge carrying the A2 over the B259 (Park Corner Road) continuing westwards and terminating in the westbound carriageway of the A2 at a point 130 metres east of the said footbridge over the A2;

Work No. 10T(7)—A road commencing by a junction with the slip road (Work No. 10T(6)) at a point 325 metres north of the junction of Park Corner Road with the road leading to North End Farm, passing southwards and terminating by a junction with Park Corner Road at a point 150 metres from that commencement;

Work NO. 10T(8)—A station access road, forming an exit slip road from the westbound carriageway of the A2, commencing by a junction with the new road (Work No. 10S(2)) at its termination, passing southwards under the A2 on the western side of the slip road (Work No. 10T(6)) to a point on the western side of the B259 (Park Corner Road) 160 metres south of the southern end of the bridge carrying the A2 over that road, then turning south-westwards, north-westwards, northwards and north-eastwards, passing over the road and the slip road (Work No. 10T(6)) on the southern side of the A2, continuing eastwards and terminating in the westbound carriageway of the A2 at a point 190 metres north-west of the bridge carrying Hall Road over the A2;

Longfield to Singlewell

Work No. 11—A railway (4,402 metres in length) commencing by a junction with the London and Chatham Railway at a point 130 metres east of the eastern abutment of the bridge carrying that railway over Pinden Road, passing eastwards, then north-eastwards on the course of the former Gravesend West Branch Railway, over the B260 (Main Road, Longfield), under Whitehill Road (Work No. 11C), the B255 (Hook Green Road) (Work No. 11D) and the B259 (Dale Road) (Work No. 11E), then eastwards under New Barn Road (Work No. 11F), and terminating at a point 60 metres east of the intended bridge forming part of that work, including a bridge over the B260;

Work No. 11A—A railway (1,366 metres in length) commencing by a junction with the railway (Work No. 11) at its termination, passing eastwards over the railway (Work No. 10) in tunnel, then south-eastwards on the northern side of that railway under Downs Road (Work No. 10P) and terminating by a junction with that railway at a point 290 metres south-east of the intended bridge forming part of that work;

Work No. 11B—A railway (1,354 metres in length) commencing by a junction with the railway (Work No. 11) at its termination, passing south-eastwards on the southern side of the railway (Work No. 10) under Downs Road (Work No. 10P) and terminating by a junction with the railway at a point 275 metres south-east of the intended bridge forming part of that work;

Work No. 11C—Realignment of Whitehill Road, including a bridge over the railway (Work No. 11), commencing in Whitehill Road at a point 375 metres south of the southern abutment of the existing bridge carrying that road over the disused railway and terminating in that road at its junction with Hook Green Road;

Work No. 11D—Realignment of the B255 (Hook Green Road), including a bridge over the railway (Work No. 11), commencing in that road at a point 50 metres south-east of its junction with Whitehill Road and terminating in the B255 at a point 190 metres east of the eastern abutment of the existing bridge over the disused railway;

Work No. 11E—Realignment of the B259 (Dale Road), including a bridge over the railway (Work No. 11), commencing in that road at a point 60 metres south of the southern abutment of the existing bridge over that disused railway and terminating in that road at a point 70 metres south of its junction with the B262 (Station Road);

Work No. 11F—Realignment of New Barn Road, including a bridge over the railway (Work No. 11), commencing in that road at a point 25 metres south of the centre of the roundabout at the junction of that road with the B262 (Station Road) and terminating in New Barn Road at a point 370 metres south-west of that commencement;

In the borough of Gravesham, parishes of Cobham and Shorne, and in the city of Rochester-upon-Medway, town of Rochester and parish of Cuxton, in the county of Kent—

Singlewell to Strood

Work No. 12—A railway (7,700 metres in length) commencing by a junction with the railway (Work No. 10) at its termination, passing eastwards on the southern side of the A2 (Watling Street), under Henhurst Road (Work No. 12D), Scotland Lane (Work No. 12E), Watling Street (B395) (Work No. 12F) and Halfpence Lane (C492) (Work No. 32C), then in tunnel for a distance of 75 metres beneath Work No. 32B and an adjoining area, under Brewers Road (Work No. 12H), over the access road (Work No. 12K) and under the access road (Work No. 12L), then passing south-eastwards on the western side of the M2, under a land bridge in Temple Wood, and terminating at a point 435 metres north-west of the southern end of the subway by which the footpath RS203 passes under the M2 as existing, including a bridge over Work No. 12K;

Work No. 12A—A railway (2,520 metres in length) on the northern side of the railway (Work No. 12) commencing by a junction with that railway at a point 50 metres east of its commencement, passing eastwards under Henhurst Road (Work No. 12D) and terminating by a junction with Work No. 12 at a point 515 metres east of the intended bridge carrying that road over that railway;

Work No. 12B—A railway (2,520 metres in length) on the southern side of the railway (Work No. 12) commencing by a junction with that railway at the said point 50 metres east of its commencement, passing eastwards under Henhurst Road (Work No. 12D) and terminating by a junction with Work No. 12 at the said point 515 metres east of the intended bridge carrying that road over that railway;

Work No. 12C—Diversion of Church Road commencing in that road at a point 170 metres north of the entrance from that road to St Margaret’s Church, Ifield Court, passing north-eastwards then south-eastwards and terminating by a junction with Henhurst Road (Work No. 12D) at a point 100 metres south of the southern abutment of the intended bridge carrying that road over the railways (Works Nos. 12, 12A and 12B);

Work No. 12D—Diversion of Henhurst Road, including a bridge over the railways (Works Nos. 12, 12A and 12B), commencing in that road at a point 40 metres south of its junction with the exit slip road from the westbound carriageway of the A2 and terminating in Henhurst Road at a point 60 metres north of the access from that road to Henhurst Cottage;

Work No. 12E—Diversion of Scotland Lane (Byway NS 195), including a bridge over the railway (Work No. 12), commencing in Scotland Lane at a point 210 metres south of its existing junction with Watling Street (B395), passing north-eastwards then eastwards to a junction with the existing access to The Mount, then passing northwards over the railway and terminating by a junction with the new road (Work No. 12F) at a point 15 metres from the commencement of that work;

Work No. 12F—A road, forming a diversion of Watling Street (B395), including a bridge over the railway (Work No. 12), commencing in that road at a point 130 metres south-east of the southern abutment of the bridge carrying that road over the A2, passing eastwards on the northern side of that road, then southwards over the railway and terminating by a junction with Halfpence Lane (C492) (Work No. 32C) at a point 80 metres north of its existing junction with Brewers Road;

Work No. 12H—Diversion of Brewers Road, including bridges over the railway (Work No. 12) and the A2, commencing in Brewers Road at its junction with Halfpence Lane (C492) passing eastwards, then north-eastwards over that railway and terminating in Brewers Road at a point 160 metres north-east of its junction with the slip roads to and from the eastbound carriageway of the A2;

Work No. 12J—An access road commencing by a junction with Brewers Road (Work No. 12H) at a point 55 metres south-west of the termination of that work, passing south-eastwards, then eastwards along the northern side of the A2 and terminating within the curtilage of Park Pale;

Work No. 12K—An access road to the Rochester and Cobham Park Golf Course, including a bridge over the A2, commencing by a junction with the access road (Work No. 12J) on the northern side of the A2 at a point 250 metres west of Park Pale, passing northwards and eastwards then southwards over that road and the A2 (including Works Nos. 31A, 31B, 34A and 35A), then westwards and southwards under the railway (Work No. 12), and terminating in the golf course south of the railway;

Work No. 12L—Diversion of an access road to Knights Place, including a bridge over the railway (Work No. 12), commencing in the existing access road from the A2 at a point 170 metres south of that road, passing southwards over the railway and terminating in the existing access road at a point 110 metres north of the access from that road to Knights Cottage;

In the city of Rochester-upon-Medway, town of Rochester and parish of Cuxton, in the borough of Tonbridge and Malling, parishes of Wouldham, Aylesford and Burham and in the borough of Maidstone, parishes of Boxley and Detling in the county of Kent—

Strood to Detling

Work No. 13—A railway (14,100 metres in length) commencing by a junction with the railway (Work No. 12) at its termination, passing south-eastwards, on the western side of the M2, over new roads (Works Nos. 36C, 36D and 36E) forming part of Junction 2 of the motorway, under the A228 (Rochester Road) (Work No. 36F), over the London and Chatham Railway, then on viaduct over the Strood and Maidstone Railway, the River Medway and Wouldham Road, then continuing south-eastwards on the western side of the M2 to a point at Nashenden Bottom, 120 metres north-west of the northern end of the go-kart racing track at Buckmore Park, south of Rochester Airport, then passing in tunnel (the North Downs Tunnel) for a distance of 3,190 metres beneath Blue Bell Hill and the North Downs, then passing south-eastwards under the Pilgrims Way (Work No. 13F), over Boarley Lane (Work No. 13G), then in tunnel for a distance of 330 metres beneath Boxley Road (Work No. 13H), continuing south-eastwards, under the A249 (Sittingbourne Road) (Work No. 13J), and Hockers Lane (Work No. 13K) and terminating at a point 270 metres east of the northern abutment of the bridge carrying Hockers Lane over the M20, including bridges over Works Nos. 36C, 36D and 36E, the London and Chatham Railway, the said viaduct, and a bridge over Work No. 13G;

Work No. 13A—Slip roads forming part of Junction 2 of the M2 pending widening of that motorway, being roads to be stopped up on the construction of the slip roads (Works Nos. 36A to 36D), comprising—

Work No. 13A(1)—A road, forming an exit slip road from the existing eastbound carriageway of the M2, commencing in that carriageway at a point 75 metres south-east of the southern end of the subway by which the footpath RS 203 passes under the motorway, passing south-eastwards and terminating by a junction with the A228 (Rochester Road) (Work No. 13A(4)) at a point 70 metres east of the eastern abutment of the existing bridge carrying that road over the M2;

Work No. 13A(2)—A road, forming an entry slip road to the existing westbound carriageway of the M2, commencing in that carriageway at a point 345 metres south-east of the southern end of the subway by which the footpath NS 183 passes under the M2, passing south-eastwards and terminating by a junction with Work No. 36C at a point 100 metres west of the southern end of the said subway for the footpath RS 203;

Work No. 13A(3)—A road forming an exit slip road from the existing westbound carriageway of the M2, commencing in that carriageway at a point 25 metres south-east of the southern abutment of the bridge carrying the M2 over the London and Chatham Railway, passing north-westwards under the railway (Work No. 13) and terminating by a junction with the western junction roundabout (part of Work No. 36E);

Work No. 13A(4)—A road, forming a diversion of the A228 (Rochester Road), commencing by a junction with the road (Work No. 36F) at a point 395 metres north-east of the commencement of that work, passing north-eastwards and eastwards and terminating by a junction with the A228 at a point 140 metres north-east of the junction with that road of the existing slip roads to the eastbound carriageway of the M2;

Work No. 13B—Diversion of Burham Road (D422) commencing by a junction with Wouldham Road at a point 30 metres south-west of the existing junction of those roads, passing south-eastwards and terminating by a junction with Burham Road 325 metres south of that road junction;

Work No. 13C—Diversion of bridleway MR11 (Stony Lane), including a bridge over the railway (Work No. 13), commencing in that bridleway at the northern end of the subway by which it passes under the M2, passing south-westwards under the M2, then north-westwards and south-westwards over the railway, then southwards and south-eastwards and terminating by a junction with Stony Lane at the north-eastern corner of Upper Nashenden Farm;

Work No. 13D—An access, for construction purposes, commencing by a junction with the existing westbound carriageway of the M2 at a point 160 metres north-west of the southern end of the existing subway by which Stony Lane passes under the motorway, passing north-westwards and westwards to the southern side of the railway (Work No. 13), passing south-eastwards on that side of the railway between chainages 4,000 and 4,190 metres, then passing eastwards, northwards and north-westwards and terminating by a junction with that carriageway of the motorway at a point 180 metres south-east of the bridge carrying Borstal Farm access over the M2;

Work No. 13E—Diversion of byway MR401, commencing by a junction with the byway at a point 160 metres south of its junction with Lower Warren Road, passing southwards over the railway (Work No. 13) in tunnel, then south-westwards and south-eastwards and terminating by a junction with byway MR401 at a point 225 metres south of that commencement;

Work No. 13F—Realignment of Pilgrims Way, including a bridge carrying that byway over the railway (Work No. 13), commencing in that byway at a point 85 metres east of the northern end of the subway by which the Pilgrims Way passes under the A229 (Chatham Road), passing eastwards then north-eastwards over the railway and terminating in that byway at a point 130 metres east of that commencement;

Work No. 13G—Diversion of Boarley Lane (D898) commencing in that road at a point 100 metres south of Boarley Cottage, passing southwards and south-eastwards under the railway (Work No. 13) and terminating in Boarley Lane at a point 50 metres north-east of the access to Boarley Oast;

Work No. 13H—Diversion of Boxley Road (C97) commencing in that road at its junction with Sandy Lane, passing north-westwards then north-eastwards over the railway (Work No. 13) in tunnel and terminating in that road at a point 50 metres north-east of the access to Street Farm, Boxley;

Work No. 13J—Realignment of the A249 (Sittingbourne Road), including a bridge over the railway (Work No. 13), commencing in that road at a point 80 metres north-east of the junction with that road of the side road to Detling and terminating in Sittingbourne Road at a point 110 metres north of the northern abutment of the eastern bridge of the roundabout through which that road passes over the M20;

Work No. 13K—Realignment of Hockers Lane, including a bridge over the railway (Work No. 13), commencing in that road at a point 230 metres north of the northern abutment of the bridge carrying that road over the M20 and terminating in Hockers Lane at a point on that bridge 260 metres south of that commencement;

In the borough of Maidstone, parishes of Detling, Thurnham, Hollingbourne, Broomfield, Harrietsham, Lenham and Boughton Malherbe, in the county of Kent—

Detling to Lenham Heath

Work No. 14—A railway (13,904 metres in length) commencing by a junction with the railway (Work No. 13) at its termination, passing south-eastwards over Thurnham Lane (Work No. 14A), Water Lane (Work No. 14B) and Crismill Lane (Work No. 14C), then over the Maidstone and Ashford Railway at a point 85 metres east of the bridge carrying the M20 over that railway, continuing south-eastwards in tunnel for a distance of 240 metres beneath the B2163 (Eyhorne Street) (Work No. 14D), then passing over Snagbrook Stream, under Hospital Road (Work No. 14E), over the A20 (Ashford Road) (Work No. 14F) and under Fairbourne Lane (Work No. 14H), over Bell Farm access (Work No. 14J), then under Runham Lane (Work No. 14K), Sandway Road (Work No. 14L), Old Ham Lane (Work No. 14M), in tunnel for a distance of 170 metres beneath Headcorn Road (Work No. 14N), then continuing under Boughton Road (Work No. 14P), Lenham Heath Road (Work No. 14Q) and Bowley Lane (Work No. 14S), over the Great Stour River at a point 40 metres north of the bridge carrying the M20 over that river, under the access road west of Hook Street (Work No. 14U) and terminating at a point 85 metres south of the junction of Bull Hill with Lenham Heath Road, including bridges over Works Nos. 14A, 14B and 14C, the Maidstone and Ashford Railway, Snagbrook Stream, Works Nos. 14F and 14J and the Great Stour River;

Work No. 14A—Diversion of Thurnham Lane commencing in that road at a point 10 metres north of the access from that road to Gorewood Farm, passing south-westwards and southwards under the railway (Work No. 14) and terminating in Thurnham Lane at a point 10 metres north of the southern side of the bridge carrying the M20 over that road;

Work No. 14B—Diversion of Water Lane commencing in that road at a point 185 metres north of the northern side of the bridge carrying the M20 over that road, passing south-westwards and southwards under the railway (Work No. 14) and terminating in Water Lane at a point 5 metres north of the southern side of that bridge;

Work No. 14C—Diversion of bridleway KH134 (Crismill Lane) commencing in that bridleway at a point 30 metres south of the entrance to the Poer Meadow Shaw Pumping Station of the Mid-Kent Water Company, passing south-westwards, then south-eastwards and south-westwards under the railway (Work No. 14) and terminating in Crismill Lane at a point 5 metres north of the northern end of the subway by which that bridleway passes under the M20;

Work No. 14D—Realignment of the B2163 (Eyhorne Street) commencing at a point in that road 140 metres north-east of the northern abutment of the bridge carrying that road over the M20, passing south-westwards over the railway (Work No. 14) in tunnel and terminating at a point 75 metres south-west of that commencement;

Work No. 14E—Diversion of Hospital Road (D971), including a bridge over the railway (Work No. 14), commencing in that road at a point 180 metres north-east of the northern end of the subway by which that road passes under the M20, passing south-westwards, north-westwards, then south-westwards over the railway and south-eastwards and south-westwards and terminating in Hospital Road at a point 10 metres north-east of the southern end of that subway;

Work No. 14F—Diversion of the A20 (Ashford Road) commencing in that road at a point 20 metres east of the southern side of the bridge carrying the M20 over that road west of Holm Mill, passing eastwards under the railway (Work No. 14), then south-eastwards on the northern side of Work No. 14 and terminating in the A20 at a point 25 metres south-east of its junction with Holm Mill Lane;

Work No. 14G—Diversion of Greenway Court Road (D946) at its junction with the A20 (Ashford Road), commencing in Greenway Court Road at a point 110 metres north-east of its junction with Greenway Lane, passing south-westwards, then southwards on the eastern side of the existing road and terminating by a junction with the A20 (Work No. 14F) at a point 105 metres east of the intended bridge carrying the railway (Work No. 14) over that road;

Work No. 14H—Realignment of Fairbourne Lane, including a bridge over the railway (Work No. 14), commencing in that road at a point 50 metres south of its junction with the A20 (Ashford Road), passing southwards over the railway and terminating at a point 45 metres south of the northern end of the bridge carrying that road over the M20;

Work No. 14J—Diversion of the Bell Farm access from Sandway Road, Harrietsham, commencing by a junction with Sandway Road at a point 130 metres south-east of its junction with East Street, passing south-eastwards, then south-westwards and southwards under the railway (Work No. 14) and terminating in that access road at a point 35 metres south of the northern end of the subway by which it passes under the M20;

Work No. 14K—Realignment of Runham Lane, including a bridge over the railway (Work No. 14), commencing in that road at a point 60 metres south-west of its junction with Sandway Road, passing south-westwards over the railway and terminating in Runham Lane at a point 10 metres south-west of the north-eastern end of the bridge carrying that road over the M20;

Work No. 14L—Diversion of Sandway Road (C92), including a bridge over the railway (Work No. 14), commencing in that road at a point 180 metres south-east of its junction with Runham Lane, passing south-eastwards on the eastern side of Sandway Road, then southwards over the railway and terminating in that road at a point 190 metres north-west of its junction with Old Ham Lane;